Advertisement // Sponsor

Verified Partner
Loading sponsor...
METRO CORRIDOR DOSSIER // KOLKATA-METRO-ORANGE-LINE-OPERATIONAL

Kolkata Metro Line 6 (Orange Line — Operational Route: Kavi Subhash ↔ Beleghata)

Fully Operational📏 9.90 km Operational Route (Kavi Subhash to Beleghata)🚉 9 Operational Stations (8 Elevated, 1 At-Grade) Stations🗓 06 Mar 2024🏢 Metro Railway, Kolkata (Owner: Indian Railways / RVNL)

Kolkata Metro Line 6 (Orange Line - Operational Segment) spans 9.90 km across 9 operational stations (8 elevated, 1 at-grade) running parallel to Eastern Metropolitan (EM) Bypass from Kavi Subhash (New Garia) to Beleghata. The corridor forms the primary arterial mass transit spine for South-Eastern Kolkata, providing direct rail interchange with Line 1 Blue Line and Eastern Railway suburban trains at New Garia.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Kolkata Metro Line 6 (Orange Line - Operational) Economics

Kolkata Metro Line 6 (Orange Line - Operational) Economics

Total InvestmentCommissioned Phase Expense ~₹4,259 Cr (Full Line Sanctioned ₹3,951.98 Cr)
Primary BackersMinistry of Railways (Government of India)
Operator / ModelRail Vikas Nigam Limited (RVNL) Execution
Station list

Kolkata Metro Line 6 (Orange Line - Operational) Stations

#StationTypeInterchange / ConnectionOpened
01
Kavi Subhash (New Garia)
At-Grade Terminal HubLine 1 Blue Line & Sealdah South Railway Interchange06 March 2024
02
Satyajit Ray (Metropolis)
ElevatedHiland Park & EM Bypass Node06 March 2024
03
Jyotirindra Nandi (Mukundapur)
ElevatedMukundapur Healthcare & Hospital Belt06 March 2024
04
Kavi Sukanta (Kalikapur)
ElevatedKalikapur Junction Node06 March 2024
05
Hemanta Mukhopadhyay (Ruby More)
Elevated HubRuby General Hospital & Anandapur Commercial Axis06 March 2024
06
VIP Bazar
ElevatedVIP Bazar Precinct Node22 August 2025
07
Ritwik Ghatak (Bantala Road)
ElevatedBantala Science City Link Node22 August 2025
08
Barun Sengupta (ITC Sonar)
ElevatedITC Sonar & JW Marriott Hotel Axis22 August 2025
09
Beleghata
Elevated Terminal HubBeleghata Suburb & Metropolitan Canal Axis22 August 2025
Geospatial Alignment

Kavi Subhash ↔ Beleghata Geospatial Alignment Map

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Specs sheet

Kolkata Metro Line 6 (Orange Line - Operational) Technical Specifications

ParameterValue
Estimated Cost₹4,259 Cr
Corridor TypeElevated Viaduct & At-Grade Terminal Hub along EM Bypass
Primary DepotNew Garia Metro Depot
Track GaugeBroad Gauge (1,676 mm / 5 ft 6 in)
Total Length9.90 km Operational Route (Kavi Subhash to Beleghata)
Opened / Est. Opening06 Mar 2024 (Kavi Subhash – Ruby / Hemanta Mukhopadhyay) | 22 Aug 2025 (Hemanta Mukhopadhyay – Beleghata)
Corridor StatusFully Operational
Peak Headway25 min (60 daily service pairs Monday–Friday)
OperatorMetro Railway, Kolkata (Owner: Indian Railways / RVNL)
Stations Count9 Operational Stations (8 Elevated, 1 At-Grade)
Daily Ridership~18,000+ Daily Passengers (5.92 Lakh Commuters Annually)
Line NumberLine 6 (Orange Line)
Signalling SystemCBTC Signalling System
Rolling StockICF MEDHA AC Broad Gauge Rakes
Maximum Operating Speed80 km/h
Electrification System750V DC Third Rail
Chronological Milestones

Kolkata Metro Line 6 (Orange Line - Operational) Timeline

2010-11

New Garia to Biman Bandar Line 6 corridor sanctioned by Railway Minister Mamata Banerjee.

February 2017

RVNL demarcated terminal station plot and commenced construction at New Garia.

06 March 2024

Phase 1 (Kavi Subhash to Hemanta Mukhopadhyay / Ruby, 5.40 km, 5 stations) inaugurated by Prime Minister Narendra Modi.

14 March 2024

RVNL erected 76-meter open-web steel girder bridge over Tagore Park culvert to bridge viaduct gap.

22 August 2025

Phase 2 extension (Hemanta Mukhopadhyay to Beleghata, 4.50 km, 4 stations) commissioned.

25 August 2025

Commercial revenue service launched between Kavi Subhash and Beleghata with 60 daily service pairs.

Proprietary analytics

Orange Line EM Bypass Transit & Regional Economic Impact

Economic Significance

Connects major healthcare, hospitality, and residential hubs along the EM Bypass arterial corridor.

Traffic Impact

De-congests heavy vehicular traffic on EM Bypass, cutting travel time from Garia to Beleghata from 50 mins to 16 mins.

Employment Centres Served

Serves major employment hubs including Ruby commercial area, ITC Sonar/JW Marriott hotel district, and Mukundapur medical precinct.

Intermodal Connectivity

Provides seamless dual-mode interchange at Kavi Subhash with Line 1 Blue Line and Sealdah South Suburban Rail.

Impact on Real Estate

Triggered significant real estate appreciate and premium commercial developments along EM Bypass.

Geospatial Explorer

Kolkata Metro Line 6 (Orange Line - Operational) Alignment Map & GIS Explorer

Corridor Type Breakdown9.90 km (8.40 km Elevated Viaduct / 1.50 km At-Grade)
Viaduct Length8.40 km Viaduct (8 Elevated Stations)
Tunnel LengthN/A (Underground section to Airport is under construction)
River Crossings76m Open-Web Steel Girder Bridge over Tagore Park Culvert
Major Bridges / CrossingsEM Bypass Flyover Parallel Structures
Primary DepotNew Garia Metro Depot

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Answers

Frequently Asked Questions

The Kolkata Metro Orange Line, also known as Line 6, is the New Garia–Airport Metro corridor. Its currently operational section runs from Kavi Subhash to Beleghata, while construction is continuing northward toward Salt Lake, New Town and the airport.

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Maharashtra Dashboard →MH
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement