Advertisement // Sponsor

Verified Partner
Loading sponsor...
METRO CORRIDOR DOSSIER // KOLKATA-METRO-GREEN-LINE-PROPOSED-EXTENSION

Kolkata Metro Line 2 (Green Line — Proposed Extension: Howrah Maidan ↔ Santragachi Bus Terminus)

Proposed & Review Stages📏 9.10 km Proposed Extension Route🚉 8 Planned Stations (8 Elevated) Stations🗓 Proposed Corridor Phase🏢 Metro Railway, Kolkata (Owner: Indian Railways / KMRC)

Kolkata Metro Line 2 (Green Line - Proposed Extension Segment) is a proposed 9.10 km western extension across 8 planned elevated stations (Foreshore Road, Coal Depot, Shalimar, Nabanna, Belepole, Bakshara, Santragachi, Santragachi Bus Terminus) connecting Howrah Maidan to Santragachi Railway Terminal and Interstate Bus Terminus. The proposed alignment serves the West Bengal State Secretariat at Nabanna, Shalimar Railway Terminal, and the Kona Expressway transit hub.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Kolkata Metro Line 2 (Green Line Extension Proposed) Economics

Kolkata Metro Line 2 (Green Line Extension Proposed) Economics

Total InvestmentDPR Proposed Feasibility Allocation
Primary BackersProposed Ministry of Railways & State Government Joint Equity
Operator / ModelKolkata Metro Rail Corporation Limited (KMRC) Proposed Execution
Target Opening

Expected Completion Date

StatusProposed & Review Stages
Target Opening DateProposed Corridor Phase
Station list

Kolkata Metro Line 2 (Green Line Extension Proposed) Stations

#StationTypeInterchange / ConnectionOpened
01
Howrah Maidan
Underground Operational HubOperational Line 2 Underground Terminal06 Mar 2024
02
Foreshore Road
Elevated (Proposed)Foreshore Road & Hooghly Riverfront Axis—
03
Coal Depot
Elevated (Proposed)Howrah Industrial Coal Depot Node—
04
Shalimar
Elevated (Proposed)Shalimar Railway Station & Freight Terminal—
05
Nabanna
Elevated (Proposed)West Bengal State Secretariat Headquarters—
06
Belepole
Elevated (Proposed)Belepole Junction Node—
07
Bakshara
Elevated (Proposed)Bakshara Residential Precinct Node—
08
Santragachi
Elevated (Proposed)South Eastern Railway Major Passenger Terminal—
09
Santragachi Bus Terminus
Elevated Proposed TerminalKona Expressway Interstate Bus Terminal Hub—
Geospatial Alignment

Howrah Maidan ↔ Santragachi Bus Terminus Proposed Alignment Map

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Specs sheet

Kolkata Metro Line 2 (Green Line Extension Proposed) Technical Specifications

ParameterValue
Estimated CostDPR Proposed
Corridor TypeElevated Viaduct Corridor along Foreshore Road & Kona Expressway
Primary DepotCentral Park Depot (Salt Lake)
Track GaugeStandard Gauge (1,435 mm)
Total Length9.10 km Proposed Extension Route
Opened / Est. OpeningProposed Corridor Phase
Corridor StatusProposed & Review Stages
OperatorMetro Railway, Kolkata (Owner: Indian Railways / KMRC)
Stations Count8 Planned Stations (8 Elevated)
Line NumberLine 2 (Green Line Extension)
Signalling SystemCBTC Signalling System
Rolling StockBEML Standard Gauge Rakes
Electrification System750V DC Third Rail
Target CompletionProposed Corridor Phase
Chronological Milestones

Kolkata Metro Line 2 (Green Line Extension Proposed) Timeline

Proposed

Line 2 western extension from Howrah Maidan to Santragachi proposed in West Bengal transit master plan.

DPR Review

Alignment survey connecting Foreshore Road, Coal Depot, Shalimar, Nabanna Secretariat, Belepole, Bakshara, and Santragachi.

Proprietary analytics

Green Line Western Extension & Howrah-Santragachi Transit Impact

Economic Significance

Extends high-speed metro connectivity to the West Bengal State Secretariat at Nabanna, Shalimar Railway Station, and Santragachi hub.

Traffic Impact

Reduces heavy road congestion on Foreshore Road, Mandirtala, and Kona Expressway.

Employment Centres Served

Serves state government employees, university students, railway commuters, and long-distance bus travelers.

Intermodal Connectivity

Establishes a multi-modal mass transit link directly integrating Howrah, Shalimar, and Santragachi railway hubs.

Impact on Real Estate

Sparked commercial real estate and logistics hub interest around Kona Expressway, Foreshore Road, and Santragachi.

Geospatial Explorer

Kolkata Metro Line 2 (Green Line Extension Proposed) Alignment Map & GIS Explorer

Corridor Type Breakdown9.10 km Elevated Viaduct (8 Stations)
Viaduct Length9.10 km Elevated Viaduct Spans along Kona Expressway
Tunnel LengthN/A
River CrossingsForeshore Road Hooghly Riverfront Viaduct Bridge
Major Bridges / CrossingsKona Expressway Parallel Viaduct Bridges
Primary DepotCentral Park Depot (Salt Lake)

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Answers

Frequently Asked Questions

The proposed extension would continue Green Line 2 westward from Howrah Maidan toward Santragachi Bus Terminus, serving the Shalimar and Nabanna areas before reaching Santragachi. The proposal is about 9.1 km long.

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Maharashtra Dashboard →MH
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement