Verified PartnerJaipur Metro Pink Line: Route, Map, Stations, Timings & Fare
Jaipur Metro Line 1 (Pink Line) is an operational east-west rapid transit corridor connecting Mansarovar to Badi Chaupar across 11.64 km and 11 stations. Phase 1A (9.63 km from Mansarovar to Chandpole) commenced commercial service on 3 June 2015, followed by Phase 1B (2.4 km underground from Chandpole to Badi Chaupar) on 23 September 2020. Two key extensions totaling 4.20 km are currently under construction: the Phase 1C eastern extension (2.85 km from Badi Chaupar to Transport Nagar on Agra Road via Ramganj Chaupar) and the Phase 1D south-western extension (1.35 km from Mansarovar to Ajmer Road Chauraha at the 200 Feet Bypass on NH-48), expanding the complete corridor scope to ~15.84 km across 14 stations. Jaipur Metro Phase 2 is a separate North–South corridor; it is not a Phase 2 of the Pink Line.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Jaipur Metro Pink Line Stations: Mansarovar to Badi Chaupar + Phase 1C/1D Extensions
| # | Station | Type | Interchange / Connection | Opened |
|---|---|---|---|---|
| 01 | Ajmer Road Chauraha | Elevated | 200 Feet Bypass & Delhi-Ajmer Expressway (NH-48) | Phase 1D, under construction |
| 02 | Mansarovar | Elevated | Depot Access & Mansarovar Township | Phase 1A Operational (3 June 2015) |
| 03 | New Aatish Market | Elevated | Commercial Retail Zone | Phase 1A Operational (3 June 2015) |
| 04 | Vivek Vihar | Elevated | Residential Suburb Reach | Phase 1A Operational (3 June 2015) |
| 05 | Shyam Nagar | Elevated | Janpath Commercial Spine | Phase 1A Operational (3 June 2015) |
| 06 | Ram Nagar | Elevated | Hawa Sadak Feeder | Phase 1A Operational (3 June 2015) |
| 07 | Civil Lines | Elevated | Government & VIP Enclave | Phase 1A Operational (3 June 2015) |
| 08 | Railway Station | Elevated | Jaipur Junction Railway Station (IR) | Phase 1A Operational (3 June 2015) |
| 09 | Sindhi Camp | Elevated | Sindhi Camp Central ISBT | Phase 1A Operational (3 June 2015) |
| 10 | Chandpole | Underground | Walled City Gateway | Phase 1A Operational (3 June 2015) |
| 11 | Chhoti Chaupar | Underground | Heritage Market & Heritage Gallery | Phase 1B Operational (23 September 2020) |
| 12 | Badi Chaupar | Underground | Hawa Mahal, City Palace & Jantar Mantar | Phase 1B Operational (23 September 2020) |
| 13 | Ramganj Chaupar | Underground | Ramganj Heritage Bazaar | Phase 1C, under construction |
| 14 | Transport Nagar | Elevated | Agra Road (NH-21) & Interstate Transport Hub | Phase 1C, under construction |
Mansarovar — Badi Chaupar Route Map
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerMansarovar — Badi Chaupar Technical Specifications
| Parameter | Value |
|---|---|
| Estimated Cost | ₹3,149 Cr (Phase 1A + 1B) |
| Fare Structure | ₹10 for 0–2 stations, ₹15 for 3–5 stations, ₹25 for 6–8 stations, and ₹30 for 9–10 stations (10% discount on Smart Cards/NCMC). |
| Corridor Type | Elevated + Underground |
| Primary Depot | Mansarovar Maintenance Depot & OCC |
| Track Gauge | Standard Gauge (1435 mm) |
| Maximum Design Speed | Maximum Design: 90 km/h | Operating: 80 km/h |
| Implementing Agency | Jaipur Metro Rail Corporation (JMRC) |
| Total Length | 11.64 km operational + 4.20 km Phase 1C/1D extensions under construction |
| Opened / Est. Opening | 3 June 2015 (Phase 1A) / 23 September 2020 (Phase 1B) |
| Corridor Status | Operational with Active Expansion / Extensions |
| Operating Timings / Hours | Mansarovar → Badi Chaupar: First train 06:20 AM, Last train 09:20 PM | Badi Chaupar → Mansarovar: First train 06:20 AM, Last train 09:20 PM (headway: 6–10 mins peak / 12–15 mins off-peak) |
| Operator | Jaipur Metro Rail Corporation (JMRC) |
| Stations Count | 14 (11 Operational + 3 Under Construction) |
| Line Number | Line 1 (Pink Line) |
| Electrification System | 25 kV AC 50 Hz Overhead Catenary System (OHE) |
| operationalSection | Mansarovar to Badi Chaupar (11.64 km, 11 Stations) |
Mansarovar — Badi Chaupar Economic & Connectivity Impact
Economic Significance
Links Mansarovar and Janpath commercial areas with the UNESCO World Heritage Walled City bazaars and the eastern Transport Nagar logistics area on Agra Road.
Traffic Impact
Provides a mass-transit alternative along the East-West corridor between Mansarovar, Jaipur Railway Station, Sindhi Camp, and Chandpole Gate.
Employment Centres Served
Connects western residential sectors with central government offices at Civil Lines and commercial markets.
Intermodal Connectivity
Provides multimodal transfer points at Jaipur Junction Railway Station, Sindhi Camp Inter-State Bus Terminal, and highway connections at NH-48 and NH-21.
Impact on Real Estate
Transit corridor traversing major residential, commercial, administrative, and heritage zones across Jaipur's East-West axis.
Mansarovar — Badi Chaupar Alignment Map & GIS Explorer
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerFrequently Asked Questions