CORRIDOR DOSSIER INDEX // VARUNA-ELEVATED-ROAD-VARANASI

Varuna Elevated Road Varanasi Route Map, Status & Latest Updates (2026)

Last Updated: July 2026
StatusProposed & Review Stages
Length43.218 km
Open SectionsPending updates
Completion~5 years after commencement
Last UpdatedJul 2026

The Varuna Elevated Road Varanasi is a proposed elevated riverfront transit corridor running alongside the Varuna River in Varanasi, Uttar Pradesh. Designed to relieve central city choke-points, it connects dense core residential and commercial areas directly to the Varanasi–Jaunpur and Babatpur Airport highways.

Project Summary

"The Union Cabinet has recently approved the 43.2 km Varuna Elevated Corridor project, a key component of Varanasi's urban mobility transformation, with an estimated cost of ₹10,998 crore. This significant milestone follows the initiation of tendering for Package-2 of the Var"

वरुणा एलिवेटेड रोड वाराणसी

वाराणसी शहरात वरुणा नदीच्या काठावर नियोजित वरुणा एलिवेटेड रोड हा एक महत्त्वाचा प्रकल्प आहे, जो शहरातील अंतर्गत वाहतूक कोंडी कमी करून बाबतपूर विमानतळ मार्गाला थेट जोडेल.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Total Length43.218 km
Estimated Cost₹10,998.32 Crore
Implementing AgencyNHAI / State Highway Authority
Current StatusProposed & Review Stages
Completion Target~5 years after commencement
Route Map

Varuna Elevated Road Varanasi Route Map & Alignment

View and download the latest Varuna Elevated Road Varanasi route map showing the project alignment, major junctions, districts covered and connectivity corridors.

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Project NameVaruna Elevated Road Varanasi
Total Length43.218 km
Estimated Cost₹10,998.32 Crore
Current StatusProposed & Review Stages
Project Parameters & Technical Details

Varuna Elevated Road Varanasi Technical Specs & Project Parameters

ParameterTechnical Specification
Project NameVaranasi Varuna Elevated Corridor
Total Length43.218 km (6/4-lane predominantly elevated highway corridor)
Current StatusProposed & Review Stages
Estimated Cost₹10,998.32 Crore
Development ModelHybrid Annuity Model (HAM)
Target Completion~5 years after commencement
Corridor End PointVaranasi Ring Road
Corridor Start PointNH-31 Interchange (Varanasi)
Implementing AuthorityNHAI / State Highway Authority

Corridor Alignment & Engineering Features

CCEA Approval & Status

The project was formally approved by the Cabinet Committee on Economic Affairs (CCEA) on July 15, 2026. The Varuna Elevated Corridor Project is designed for operating speeds of 80–100 km/h and will be executed by the National Highways Authority of India (NHAI) to connect NH-31 with the Varanasi Ring Road.

Major Regional Impact

Integrating the Varuna Elevated Corridor Route on the official Varuna Elevated Corridor Map shows that the predominantly elevated alignment will reduce travel times between NH-31 and Kashi Railway Station from 40 minutes to just 20 minutes. It provides enhanced direct access to key terminals including Varanasi Airport, Varanasi Junction, Varanasi City Railway Station, Deen Dayal Upadhyaya Junction, Ramnagar Port, Sampurnanand Sanskrit University, Ghats of Varanasi, and the Chandauli region.

Project Cost Breakdown

Of the total ₹10,998.32 crore capital cost, civil construction is estimated at ₹4,565.33 crore (including utility shifting) and land acquisition cost is estimated at ₹934.91 crore.

Key Alignment Interchanges & Nodes Covered:
📍 NH-31📍 Varanasi Ring Road📍 Kashi Railway Station📍 Varanasi City Railway Station📍 Varanasi Junction📍 Deen Dayal Upadhyaya Junction📍 Varanasi Airport📍 Ramnagar Port📍 Sampurnanand Sanskrit University📍 Ghats of Varanasi📍 Chandauli region

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Timeline

Latest Developments

Verified project updates from news sources and official announcements
Video Coverage

Video Updates

Latest drone footage, progress reports, and ground coverage
Project Schedule

Latest Project Updates & Timeline

July 2026

CCEA Approval

The Cabinet Committee on Economic Affairs (CCEA), chaired by Prime Minister Narendra Modi, approved the 43.218 km elevated corridor project with an estimated budget of ₹10,998.32 crore.

Late 2026

DPR & Land Survey

Pre-construction works, including detailed project report finalisation and land acquisition surveys, were initiated by NHAI.

Future

Tendering Stage

Tenders will be invited for construction packages under the Hybrid Annuity Model (HAM).

Advertisement // Sponsor

Verified Partner
Loading sponsor...
General Inquiries

Varuna Elevated Road Varanasi FAQs

The Varuna Elevated Road Varanasi project, officially described as the Varuna Elevated Corridor, is a 43.218-km predominantly elevated 6/4-lane road corridor planned to decongest Varanasi. It will connect NH-31 with the Varanasi Ring Road through a corridor associated with the Varuna River and will include elevated sections, flyovers, loops, ramps and link roads.

Related Infrastructure Projects

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Uttar Pradesh Dashboard →UP
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement