Verified PartnerRaipur–Naya Raipur Expressway (Atal Path) Route Map, Toll Rates, Status & Latest Updates (2026)
Constructed by M/s Iron Triangle Limited under PWD Chhattisgarh and CGRDC oversight along the historic Chhoti Line narrow-gauge railway alignment, the 12.7 km Raipur–Naya Raipur Expressway (Atal Path) provides direct, signal-free connectivity between Raipur Junction, GE Road (NH-53), Swami Vivekananda Airport access roads, and Nava Raipur. Operating completely toll-free with 4 flyovers, 1 elevated crossing, and service lanes, the corridor is being expanded with an approved ₹87.53 Crore grade separator at Phundahar Chowk.
“Constructed by M/s Iron Triangle Limited under PWD Chhattisgarh and CGRDC oversight along the historic Chhoti Line narrow-gauge railway track, the 12.7 km Raipur–Naya Raipur Expressway (Atal Path) provides direct connectivity between Raipur Junction, GE Road (NH-53), Swami Vivekananda Airport approach roads, and Nava Raipur. Operating toll-free with 4 flyovers and 1 elevated crossing, the corridor is further being upgraded with an approved ₹87.53 Crore grade separator at Phundahar Chowk.”
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Route Map & Corridor Alignment (Fafadih to Shadani Darbar)
Interactive GIS alignment of the Raipur–Naya Raipur Expressway (Atal Path) tracing the converted narrow-gauge railway right-of-way from Fafadih through Devendra Nagar, Telibandha (NH-53 crossing), Amlidih, and Phundahar Chowk to Shadani Darbar.
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerTechnical Specifications & Engineering Parameters
| Parameter | Verified Details |
|---|---|
| Official / Popular Name | Raipur–Naya Raipur Expressway (Atal Path) |
| Corridor Length | 12.7 km (12.02 km CGRDC viaduct & highway stretch) |
| Project Cost & Upgrades | ₹293.95 Crore (Mainline) • ₹87.53 Cr (Phundahar Grade Separator) |
| Implementing Authorities | CGRDC / PWD Chhattisgarh |
| Original Contractor | M/s Iron Triangle Limited • CGRDC |
| Lane Configuration | 4-Lane Mainline with Service Roads (6-Lane Corridor) |
| Key Structures | 4 Flyovers, 1 Elevated Corridor (over NH-53) & 6+ Bridges |
| Origin & Terminus | Fafadih Chowk (Raipur Junction) ➔ Shadani Darbar (Atal Nagar / NH-30) |
| Toll & Speed Governance | Regulated by Traffic Police • 100% Toll-Free |
| Construction & Opening | Started: April 2017 • Opened: March 2019 • Grade Separator: 2026 |
Corridor History, Railway Conversion & Phundahar Upgrade
Built along the abandoned narrow-gauge Raipur–Dhamtari railway track (Chhoti Line), this vital Raipur Naya Raipur highway project became feasible after narrow-gauge train operations along Fafadih–Telibandha ceased in mid-2017. Civil construction was awarded to M/s Iron Triangle Limited in 2017 for ₹293.95 Crore under Chhattisgarh PWD and CGRDC oversight, integrating 4 flyovers, an elevated crossing over Great Eastern Road (NH-53), and dedicated service roads for local traffic.
As part of ongoing Naya Raipur road development and regional decongestion, CGRDC and PWD Chhattisgarh completed formal rehabilitation works following initial monsoon audits. To further expand corridor capacity and facilitate smooth airport transit, the state government approved an ₹87.53 Crore grade separator at Phundahar Chowk (VIP Road junction), complementing major regional logistics spines including the upcoming Raipur–Visakhapatnam Economic Corridor and the Mumbai–Nagpur Samruddhi Expressway.
Raipur–Naya Raipur Expressway (Atal Path) Toll Status
12.7 km Telibandha to Atal Nagar Corridor (CGRDC 100% Toll-Free Urban Expressway)
The Raipur–Naya Raipur Expressway (popularly known as Atal Path) was constructed by CGRDC and PWD Chhattisgarh along a decommissioned narrow-gauge railway corridor to link Raipur city (Telibandha / VIP Chowk) to the planned capital of Atal Nagar (Naya Raipur). Built with state infrastructure funding, the expressway is operated completely toll-free with zero user fee charged across all 12.7 km.
Corridor Terminals & Alignment
12.7 km Capital Corridor| No. | Fee Plaza / Facility | Chainage / Junction | District / State | Classification | Role & Corridor Scope |
|---|---|---|---|---|---|
| 1 | Telibandha to Atal Nagar Alignment | Km 0 to Km 12.7 | Chhattisgarh | Toll-Free Capital Corridor | Grade-separated 4/6-lane expressway connecting old Raipur to new administrative capital; 100% toll-free. |
Calculate Exact Toll Rates & Journey Price
Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.
Advertisement // Sponsor
Verified PartnerLatest Developments & News Timeline
Video Coverage & Drone Updates
Mainline Sections, Flyovers & Grade Separator Works
12.02–12.7 km 4-lane access-controlled expressway with service roads (6-lane overall footprint), bypassing NH-53 urban bottlenecks between Raipur Railway Station and Dhamtari Road.
Comprises 4 urban flyovers, 1 elevated corridor soaring over Great Eastern Road (NH-53) at Telibandha, and 6+ bridges providing continuous signal-free transit.
Following structural inspection and quality reviews after the July 2019 forced opening, CGRDC executed reconstruction, repair, and PMC-supervised quality remediation across distressed sections.
Sanctioned at ₹87.53 Crore to build a dedicated grade separator at Phundahar Chowk on Atal Path (alongside a ₹56.07 Cr overpass on VIP Road) to eliminate airport-corridor bottlenecks.
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
The Raipur–Naya Raipur Expressway (officially Atal Path) is a 12.02–12.7 km, 6-lane access-controlled urban highway in Chhattisgarh. It starts at Fafadih Chowk near Raipur Junction Railway Station, passes through Devendra Nagar, Pandri, Telibandha, and Phundahar (VIP Road), and terminates at Shadani Darbar on Dhamtari Road (NH-30) providing direct signal-free access to Nava Raipur Atal Nagar.
The expressway has an official continuous length of 12.02 km (12.7 km with approaches) built by CGRDC and PWD Chhattisgarh. It features a 6-lane cross-section with a 4-lane access-controlled main carriageway designed for 80 km/h traffic, flanked by dedicated 2-lane service roads on both sides for local commuters.
No, the Raipur–Naya Raipur Expressway (Atal Path) is 100% toll-free for all commuters. The Government of Chhattisgarh operates this corridor as a public-utility urban arterial route, meaning cars, two-wheelers, electric BRTS buses, and commercial vehicles travel without any toll plazas or FASTag fees.
The expressway civil works were constructed by M/s Iron Triangle Limited under Chhattisgarh PWD and CGRDC oversight at an initial contract cost of ₹293.95 Crore. In 2026, the state government approved an additional ₹87.53 Crore dedicated grade separator at Phundahar Chowk and a ₹56.07 Crore VIP Road overpass to further eliminate junction congestion.
The corridor repurposed the historic 100-year-old Raipur–Dhamtari narrow-gauge railway alignment (Chhoti Line) after train operations permanently ceased in 2017. Utilizing this vacant railway right-of-way avoided expensive urban land acquisition and demolitions, allowing PWD to build a signal-free 6-lane corridor that bypasses heavy traffic on Great Eastern Road (NH-53).
The corridor features a major 600-meter elevated viaduct crossing over Great Eastern Road (NH-53) at Telibandha Chowk, along with 4 multi-lane flyovers at Devendra Nagar, Shankar Nagar/Pandri, Amlidih/New Rajendra Nagar, and Phundahar Chowk. The alignment also incorporates 6 water bridges and two-way dedicated service roads.
Under a ₹360+ Crore urban decongestion package approved in 2026, Chhattisgarh PWD is constructing an ₹87.53 Crore grade separator at Phundahar Chowk on Atal Path and a ₹56.07 Crore overpass on VIP Road. This upgrade lifts through-traffic overhead to provide a congestion-free link toward Swami Vivekananda Airport at Mana.
The expressway reduces travel time between Raipur Junction Railway Station and Nava Raipur from 45–60 minutes down to just 15–20 minutes. It offers direct connectivity to Mantralaya (Mahanadi Bhawan), IIM, and AIIMS residential sectors, while commuters heading to Swami Vivekananda Airport branch off at Phundahar / VIP Road within 12–15 minutes.
रायपुर–नया रायपुर एक्सप्रेसवे (अटल पथ) लगभग 12.02 से 12.7 किलोमीटर लंबा 6-लेन शहरी एक्सप्रेसवे है। यह पुराने रायपुर में रायपुर रेलवे स्टेशन के पास फाफाडीह चौक से शुरू होकर देवेंद्र नगर, पंडरी, तेलीबांधा और फूंडहर होते हुए धमतरी रोड (NH-30) पर शदाणी दरबार तक जाता है, जिससे नवा रायपुर अटल नगर की कनेक्टिविटी बेहद तेज और आसान हो जाती है।
नहीं, रायपुर–नया रायपुर एक्सप्रेसवे (अटल पथ) पूरी तरह से टोल-फ्री (टोल मुक्त) है। छत्तीसगढ़ सरकार और PWD द्वारा इसे आम जनता और सरकारी कर्मचारियों के लिए एक पब्लिक यूटिलिटी मार्ग के रूप में बनाया गया है, इसलिए इस पूरे 12.7 किमी रूट पर किसी भी वाहन से कोई टोल टैक्स या FASTag शुल्क नहीं लिया जाता है।
यह एक्सप्रेसवे रायपुर से धमतरी के बीच चलने वाली ऐतिहासिक नैरो गेज रेलवे लाइन (छोटी लाइन) की खाली जमीन पर बनाया गया है, जिसे 2017 में बंद कर दिया गया था। रेलवे ट्रैक की खाली जमीन का उपयोग करने से बिना किसी मकान या दुकान को तोड़े 6-लेन का चौड़ा रास्ता मिल गया, जिससे शहर के बीच जीई रोड (NH-53) के भारी ट्रैफिक जाम से हमेशा के लिए मुक्ति मिल गई।
एक्सप्रेसवे पर तेलीबांधा में जीई रोड (NH-53) के ऊपर से गुजरने वाला एक मुख्य 600 मीटर लंबा 6-लेन एलिवेटेड कॉरिडोर बना है। इसके अलावा देवेंद्र नगर, शंकर नगर/पंडरी, अमलीडीह/न्यू राजेंद्र नगर और फूंडहर में 4 बड़े फ्लाईओवर तथा स्थानीय नालों पर 6 पुल बनाए गए हैं, ताकि मुख्य एक्सप्रेसवे का ट्रैफिक बिना किसी लाल बत्ती के निर्बाध चलता रहे।
वर्ष 2026 में स्वीकृत ₹360+ करोड़ के रायपुर शहर विकास पैकेज के तहत अटल पथ पर फूंडहर चौक के लिए ₹87.53 करोड़ का डेडिकेटेड ग्रेड सेपरेटर और वीआईपी रोड पर ₹56.07 करोड़ का ओवरपास मंजूर किया गया है। इसका निर्माण कार्य शुरू हो चुका है, जिससे स्वामी विवेकानंद एयरपोर्ट (माना) जाने वाले यात्रियों को पीक ऑवर्स में ट्रैफिक जाम से पूरी राहत मिलेगी।
अटल पथ एक्सप्रेसवे बनने के बाद रायपुर रेलवे स्टेशन (फाफाडीह) से नवा रायपुर पहुंचने में मात्र 15 से 20 मिनट का समय लगता है, जबकि पुराने जीई रोड वाले रास्ते से 45 से 60 मिनट लगते थे। इस सिग्नल-फ्री मार्ग से मंत्रालय (महानदी भवन), इंद्रावती भवन, आईआईएम और एम्स परिसर तक बिना किसी रुकावट के तेज व सुरक्षित यात्रा संभव होती है।
अटल पथ का दक्षिणी छोर शदाणी दरबार के पास धमतरी रोड (NH-30) पर मिलता है, जहां से वाहन सीधे नवा रायपुर आउटर रिंग रोड होते हुए निर्माणाधीन ₹20,000+ करोड़ के 6-लेन रायपुर–विशाखापत्तनम ग्रीनफील्ड इकोनॉमिक कॉरिडोर (NH-130CD) से जुड़ जाते हैं। इससे रायपुर के औद्योगिक क्षेत्रों के भारी वाहन बिना शहर में घुसे सीधे विशाखापत्तनम पोर्ट तक पहुंच सकते हैं।