Verified PartnerRaipur–Bilaspur Highway Corridor Route Map, Toll Rates, Status & Latest Updates (2026)
The Raipur–Bilaspur Highway Corridor is a 126.525 km 4-to-6-lane access-controlled economic arterial highway connecting Chhattisgarh's state capital Raipur with the high court and railway hub of Bilaspur via Simga. Traversing National Highways 30, 130, and 49, it has reduced intercity travel time to under two hours.
The ₹1,963.88-crore Raipur–Bilaspur Highway is a 126.525 km national highway corridor in Chhattisgarh connecting Raipur and Bilaspur across Raipur, Baloda Bazar–Bhatapara, Mungeli, and Bilaspur districts. The highway combines the 48.580 km Raipur–Simga section on NH-30 with the 77.945 km Simga–Bilaspur section, which is divided into the Simga–Sargaon (42.446 km) and Sargaon–Bilaspur (35.499 km) construction packages on NH-130 and NH-49. Built and opened in phases between 2018 and 2021, the corridor has been managed by National Highways Infra Trust (NHIT) under two 20-year TOT concessions since 1 April 2025.
रायपुर–बिलासपुर हाईवे कॉरिडोर
रायपुर–बिलासपुर राजमार्ग छत्तीसगढ़ की राजधानी रायपुर को न्यायधानी बिलासपुर से जोड़ने वाला 126.525 किमी लंबा प्रमुख 4-से-6 लेन का आर्थिक कॉरिडोर है। यह राज्य के व्यापारिक और औद्योगिक विकास की जीवन रेखा है।
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Raipur–Bilaspur Highway Corridor Route Map & Alignment
View and download the latest Raipur–Bilaspur Highway Corridor route map showing the project alignment, major junctions, districts covered and connectivity corridors.
Advertisement // Sponsor
Verified Partner
Advertisement // Sponsor
Verified PartnerRaipur–Bilaspur Highway CorridorCost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| status | Fully Operational |
| highways | NH-30,NH-130,NH-49 |
| sections | [object Object],[object Object] |
| Project Name | Raipur–Bilaspur Highway Corridor |
| Total Length | 126.525 km |
| approval_date | 19 February 2015 (CCEA approval under NHDP Phase IV) |
| approved_cost | ₹1,963.88 crore (2015 CCEA-approved estimate, including land acquisition and pre-construction) |
| configuration | Four- and six-lane divided highway with grade separators and bypass |
| corridor_name | Raipur–Bilaspur Highway (NH-30, NH-130 & NH-49) |
| Current Status | Fully Operational |
| Estimated Cost | ₹1,963.88 Crore |
| Total Packages | 3 construction packages; 2 TOT concession assets. |
| concession_model | Two separate 20-year Toll-Operate-Transfer (TOT) concessions |
| Inauguration Date | 2018–2021 |
| Target Completion | 2018–2021 |
| concession_expiry | 31 March 2045 |
| chainage_breakdown | [object Object] |
| concession_manager | National Highways Infra Trust (NHIT) |
| districts_traversed | Raipur District (Raipur, southern approach, Tarpongi),Baloda Bazar–Bhatapara District (Simga section junction at km 48.580, Nandghat),Bilaspur District (Bhojpuri, Mudipar, Bilaspur Bypass) |
| nhit_asset_length_km | [object Object] |
| operations_commenced | 1 April 2025 |
| Implementing Authority | NHAI |
| total_chainage_length_km | 126.525 |
Official NHAI Toll Plaza Tariffs (FY 2026–27)
User fees on the Raipur–Bilaspur Highway are collected at three designated fee plazas: Tarpongi (km 32.013 on NH-30), Bhojpuri (km 97.516 on NH-130), and Mudipar (km 110.300 on NH-49). FASTag is the primary payment method across all lanes.
| No. | Toll Plaza Name | Plaza Code / Chainage | Interchange Details & Connectivity |
|---|---|---|---|
| 1 | Tarpongi Fee Plaza | km 32.013 | Toll plaza on the Raipur–Simga section of NH-30. |
| 2 | Bhojpuri Fee Plaza | km 97.516 | Toll plaza on NH-130 within the Simga–Bilaspur corridor. |
| 3 | Mudipar Fee Plaza | km 110.300 | Toll plaza on NH-49 on the approach to Bilaspur. |
Calculate Exact Toll Rates & Journey Price
Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.
Major Locations Along the Raipur–Bilaspur Highway
The corridor connects key regional centres and toll plazas across central Chhattisgarh:
- Raipur (km 0.000): Southern starting point of the project corridor, connecting with the national highway network around the state capital.
- Tarpongi Fee Plaza (km 32.013): Toll plaza on the Raipur–Simga section of NH-30.
- Simga Junction (km 48.580): Transition point between the Raipur–Simga and Simga–Bilaspur project sections, where the route continues towards Bilaspur on NH-130.
- Sargaon (around km 91.026): Important section boundary between the Simga–Sargaon and Sargaon–Bilaspur stretches.
- Bhojpuri Fee Plaza (km 97.516): Toll plaza on NH-130 within the Simga–Bilaspur corridor.
- Mudipar Fee Plaza (km 110.300): Toll plaza on NH-49 on the approach to Bilaspur.
- Bilaspur Bypass (km 126.525): Northern end of the project corridor, connecting traffic around Bilaspur.
Districts & Major Locations Along the Corridor
The Raipur–Bilaspur Highway corridor traverses four central Chhattisgarh districts, connecting the state capital with the Bilaspur regional hub. Its major administrative areas include:
Raipur city, Dharsiwa industrial area, and Tarpongi toll-plaza vicinity
Simga junction, Nandghat and surrounding areas
Sargaon town and the Simga–Sargaon (42.446 km) / Sargaon–Bilaspur (35.499 km) package boundary
Bhojpuri toll plaza, Mudipar toll plaza on NH-49, and Bilaspur Bypass
Route Alignment & Highway Scope
The Raipur–Bilaspur corridor begins at Raipur (km 0.000) and follows NH-30 northwards for 48.580 km to Simga. From Simga, the 77.945 km Simga–Bilaspur section is split into two distinct civil construction packages: the 42.446 km Simga–Sargaon package and the 35.499 km Sargaon–Bilaspur package. The corridor follows NH-130 up to km 105.980, after which it transitions to NH-49 (Bilaspur Bypass), extending to km 126.525 where the Mudipar fee plaza (km 110.300) is located. The combined project chainage is 126.525 km across four districts: Raipur, Baloda Bazar–Bhatapara, Mungeli, and Bilaspur. The highway was constructed and opened in phases between 2018 and 2021. The two road assets are operated under 20-year TOT concessions awarded to NHIT-related concessionaire entities, effective 1 April 2025: Raipur–Simga (48.580 km concession asset) and Simga–Bilaspur (77.945 km concession asset).
Travel Advisory & Highway Conditions
The Raipur–Bilaspur corridor provides an operational national highway connection through Simga and Sargaon. Motorists should account for traffic, roadworks, local junction movements and maintenance activity, particularly along the Simga–Sargaon stretch. FASTag should be kept active with sufficient balance; UPI is available under the applicable National Highway fee rules for users without a valid FASTag. Drivers should check current route conditions before travelling.
Advertisement // Sponsor
Verified PartnerLatest Developments
Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
The Raipur–Bilaspur Highway is a 126.525 km national highway corridor in Chhattisgarh connecting Raipur and Bilaspur through Simga and Sargaon. It comprises the Raipur–Simga section on NH-30 and the Simga–Bilaspur section on NH-130 and NH-49.
The corridor has two main highway sections and three construction packages: Raipur–Simga (48.580 km), Simga–Sargaon (42.446 km), and Sargaon–Bilaspur (35.499 km). The two Simga–Bilaspur packages together measure 77.945 km.
The Raipur–Simga section is 48.580 km long and runs along NH-30. It connects Raipur with Simga and includes the Tarpongi Fee Plaza at km 32.013.
The Simga–Bilaspur section measures 77.945 km. It comprises the 42.446 km Simga–Sargaon construction package and the 35.499 km Sargaon–Bilaspur package, following NH-130 and NH-49.
The Raipur–Bilaspur Highway follows NH-30 from Raipur to Simga, continues along NH-130 towards Bilaspur, and transitions to NH-49 at approximately km 105.980 on the Bilaspur Bypass. These sections form the 126.525 km project corridor.
Yes. The Raipur–Simga and Simga–Bilaspur sections are operational and open to traffic. The highway was constructed and opened in phases between 2018 and 2021, and is currently managed under separate TOT concessions.
The Cabinet Committee on Economic Affairs (CCEA) approved the four- and six-laning of the Raipur–Bilaspur Highway corridor on 19 February 2015 under the National Highways Development Project (NHDP) Phase IV.
The CCEA-approved estimated project cost for the Raipur–Bilaspur Highway was ₹1,963.88 crore in 2015. The estimate included land acquisition, resettlement and rehabilitation, and other pre-construction activities.
The highway was constructed and opened in phases between 2018 and 2021. The phased four-laning works across the three construction packages were reported completed by 31 March 2021. The separate TOT concession operations began on 1 April 2025; this was not the highway's original opening date.
The two road assets are operated under 20-year TOT concessions awarded to NHIT-related concessionaire entities, effective 1 April 2025. The Raipur–Simga and Simga–Bilaspur concessions commenced on 1 April 2025 and are scheduled to end on 31 March 2045.
The corridor has three listed fee plazas: Tarpongi at km 32.013 on NH-30, Bhojpuri at km 97.516 on NH-130, and Mudipar at km 110.300 on NH-49. They serve the Raipur–Simga and Simga–Bilaspur sections.
The published FY 2026–27 single-journey car, jeep or van toll rates are ₹100 at Tarpongi, ₹105 at Bhojpuri and ₹50 at Mudipar. The corresponding return-journey rates are ₹150, ₹160 and ₹75. Toll charges for other vehicle categories and monthly passes differ by plaza.
The published local monthly pass for eligible non-commercial vehicles within the prescribed 20 km radius is ₹360 at Tarpongi and ₹350 each at Bhojpuri and Mudipar. The pass is plaza-specific and subject to applicable eligibility conditions.
The Raipur–Bilaspur Highway corridor passes through four districts in Chhattisgarh: Raipur, Baloda Bazar–Bhatapara, Mungeli and Bilaspur. Major route locations include Raipur, Tarpongi, Simga, Nandghat, Sargaon, Bhojpuri, Mudipar and the Bilaspur Bypass.
No. The Raipur–Bilaspur Highway is a specific 126.525 km operational corridor using NH-30, NH-130 and NH-49 in Chhattisgarh. It should not be confused with the wider Raipur–Dhanbad Economic Corridor, which is a separate regional infrastructure project.
Related Infrastructure Projects
Delhi Mumbai Expressway
India's massive 1,350 km greenfield expressway reducing capital-to-financial hub transit down to 12 hours.
View Project →Trans-Haryana Expressway (NH-152D)
A 227.020 km six-lane access-controlled greenfield highway (NH-152D) linking Gangheri near Ismailabad with the Narnaul Bypass across 8 districts and 16 fee plazas under Bharatmala Pariyojana.
View Project →Delhi–Panipat Expressway (NH-44)
An approximately 70.7 km eight-lane highway upgrade on NH-44 connecting Mukarba Chowk to Panipat, connecting with the separate 10 km six-lane Panipat Elevated Highway.