Advertisement // Sponsor
Verified PartnerPalm Beach Road Route Map, Toll Rates, Status & Latest Updates (2026)
Palm Beach Expressway, commonly searched as Palm Beach Road or Palm Beach Marg, is a major six-lane arterial corridor in Navi Mumbai connecting Vashi and Belapur through Sanpada, Seawoods and Nerul. Spanning approximately 10 km, the operational corridor provides an important north-south road connection between major residential, commercial and transport nodes in Navi Mumbai.
This portal tracks the Palm Beach Expressway Route Map, Palm Beach Road alignment, interchange points, latest construction progress, and infrastructure developments. For the latest Palm Beach Expressway news, this page tracks major construction, connectivity and infrastructure developments related to Palm Beach Road and its Ghansoli–Airoli extension. It plays an important connectivity role alongside major regional infrastructure projects including the JNPT Expressway, Pagote Chowk Expressway, the Mumbai Trans Harbour Link (Atal Setu), and the Virar Alibaug Multimodal Corridor.
To expand northern regional connectivity, the Navi Mumbai Municipal Corporation (NMMC) in coordination with CIDCO is constructing the 3.47 km Palm Beach Road Extension between Ghansoli and Airoli. Featuring an approximately 1.9 km elevated section crossing mangrove areas, the extension is intended to provide a more direct Ghansoli–Airoli connection and an alternative route to the Thane–Belapur Road corridor, with access towards the Airoli–Mulund Creek Bridge. Earlier project reporting targeted September 2026 for completion; this was an earlier project target and should not be treated as a confirmed opening date.
Palm Beach Road is an operational 10 km, 6-lane arterial corridor connecting Vashi and Belapur in Navi Mumbai. A separate 3.47 km Ghansoli–Airoli extension with an approximately 1.9 km elevated section is currently under construction by NMMC and CIDCO to enhance connectivity towards the Airoli–Mulund bridge.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Palm Beach Expressway Route Map & Alignment
Explore the 10 km operational Palm Beach Road corridor from Vashi to Belapur and the 3.47 km Ghansoli–Airoli extension.
Advertisement // Sponsor
Verified Partner
Advertisement // Sponsor
Verified PartnerPalm Beach ExpresswayCost • Route • Length • Timeline
| Parameter | Technical Details |
|---|---|
| Location | Navi Mumbai, Maharashtra |
| Project Name | Palm Beach Road / Palm Beach Marg |
| Total Length | 10.0 km |
| Primary Route | Vashi – Sanpada – Nerul – Belapur |
| Current Status | Fully Operational |
| Estimated Cost | ₹540–550 Crore (Extension) |
| Corridor Status | Fully Operational |
| Elevated Section | Approximately 1.9 km |
| Extension Length | 3.47 km |
| Extension Status | Under Construction |
| Current Extension | Ghansoli–Airoli Palm Beach Road Extension |
| Target Completion | September 2026 (Extension Target) |
| Road Configuration | 6 Lanes |
| Total Corridor Length | Approximately 10 km |
| Implementing Authority | NMMC / CIDCO |
| Extension Estimated Cost | ₹540–550 crore |
| Earlier Completion Target | September 2026 |
| Extension Construction Started | February 2025 |
| Extension Implementing Agencies | NMMC + CIDCO |
Palm Beach Road Toll Rates & Exemption Status
Palm Beach Road (Palm Beach Marg) operates as an open-access urban arterial corridor maintained by NMMC and CIDCO. The route has zero toll plazas and charges no user fees across all vehicle categories (Car, Two-Wheeler, LCV, Bus, Truck).
| No. | Toll Plaza Name | Plaza Code / Chainage | Interchange Details & Connectivity |
|---|---|---|---|
| 1 | Vashi–Belapur Arterial Alignment | Km 0 to Km 10 | Open access dual-carriageway arterial connecting Vashi, Sanpada, Nerul, Seawoods and Belapur without toll collection. |
Calculate Exact Toll Rates & Journey Price
Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.
Nodes & Interchanges Along Palm Beach Road
Key residential, commercial, and transit nodes connected along the corridor in Navi Mumbai.
Starts near Vashi Sector 17 / Sion–Panvel Highway junction
Connects Sanpada, Seawoods Darave, and NRI Complex
Connects Nerul, Diwale, and Killa Junction at CBD Belapur
Under-construction NMMC/CIDCO elevated link towards Airoli–Mulund Bridge
Palm Beach Expressway Route & Alignment
Palm Beach Expressway (Palm Beach Road / Palm Beach Marg) connects Vashi and Belapur through Sanpada, Seawoods, and Nerul across a ~10 km 6-lane corridor in Navi Mumbai. The separate 3.47 km Ghansoli–Airoli extension includes a ~1.9 km elevated section over mangrove zones to link towards the Airoli–Mulund Creek Bridge.
Navi Mumbai North–South Connectivity & Travel Time
Serves as the primary high-speed arterial bypass parallel to the Thane–Belapur Road and Sion–Panvel Highway, cutting intra-city travel time between Vashi and CBD Belapur to 12–15 minutes.
Palm Beach Expressway Route
Palm Beach Expressway, commonly searched as Palm Beach Road or Palm Beach Marg, follows the established ~10 km corridor connecting Vashi and Belapur through Sanpada and Nerul. The current Ghansoli–Airoli Palm Beach Road Extension extends the network northward towards Airoli and the Airoli–Mulund Creek Bridge.
- Vashi
- Sanpada
- Nerul
- Seawoods
- Belapur
- Diwale / CBD Belapur
- Thane–Belapur Road
Palm Beach Expressway Connectivity
Palm Beach Road provides an important north-south road connection within Navi Mumbai and links with major corridors serving Vashi, Sanpada, Nerul, Seawoods, CBD Belapur, Thane–Belapur Road, and Sion–Panvel Highway.
Palm Beach Expressway Construction & Status (2026)
While the existing 10 km Vashi–Belapur corridor is operational, construction activity is focused on the 3.47 km Ghansoli–Airoli Palm Beach Road Extension (including a ~1.9 km elevated mangrove section), which began in February 2025 after environmental clearances.
Advertisement // Sponsor
Verified PartnerLatest Developments
Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
Palm Beach Expressway is a commonly used search term for Palm Beach Road or Palm Beach Marg, an approximately 10 km six-lane road corridor in Navi Mumbai connecting Vashi and Belapur through Sanpada and Nerul. The existing corridor is operational, while a separate Ghansoli–Airoli extension is under construction.
The Palm Beach Expressway route follows the existing Palm Beach Road corridor between Vashi and Belapur, passing through major Navi Mumbai nodes including Sanpada and Nerul. The separate Ghansoli–Airoli extension is being developed to extend connectivity towards Airoli and the Airoli–Mulund Creek Bridge.
The Palm Beach Expressway map on this page represents the broader Palm Beach Road / Palm Beach Marg corridor in Navi Mumbai. The mapped corridor is approximately 10 km long and follows the Vashi–Sanpada–Nerul–Belapur route. The 3.47 km Ghansoli–Airoli extension is a separate project associated with this corridor.
The Palm Beach Expressway alignment follows the established Palm Beach Road corridor connecting Vashi and Belapur through Sanpada and Nerul. The separate Ghansoli–Airoli extension continues the road network northwards towards Airoli and includes an approximately 1.9 km elevated section through the mangrove-sensitive area.
The existing Palm Beach Road corridor is approximately 10 km long and has six lanes. Separately, the Ghansoli–Airoli Palm Beach Road Extension is approximately 3.47 km long, including an approximately 1.9 km elevated section.
The existing Palm Beach Road is an operational road corridor and does not have one current construction-package cost. The separate Ghansoli–Airoli Palm Beach Road Extension has been reported at an estimated cost of approximately ₹540–550 crore, with NMMC and CIDCO involved in funding and implementation.
The existing Palm Beach Road corridor is already operational. Construction activity is focused on the separate 3.47 km Ghansoli–Airoli Palm Beach Road Extension, which includes an approximately 1.9 km elevated section. Construction began in February 2025 after environmental clearances.
The main approximately 10 km Palm Beach Road corridor is operational. The separate Ghansoli–Airoli Palm Beach Road Extension remains under construction. May 2026 reporting on an NMMC inspection recorded ongoing construction, while February 2026 reporting indicated that completion could extend into 2027.
Recent updates have focused on construction of the Ghansoli–Airoli Palm Beach Road Extension. The 3.47 km project includes an approximately 1.9 km elevated section and is intended to improve connectivity towards Airoli and the Airoli–Mulund Creek Bridge while providing an alternative route to the Thane–Belapur Road corridor.
The existing Palm Beach Road corridor is already operational. For the separate Ghansoli–Airoli extension, September 2026 was an earlier reported completion target, but it should not be treated as a confirmed opening date. February 2026 reporting indicated that completion could extend into 2027, and the project was still under construction in May 2026.
The existing Palm Beach Road corridor and the Ghansoli–Airoli extension are related but should be treated as separate sections. The 3.47 km extension is being constructed specifically to provide a direct connection between Ghansoli and Airoli and improve access towards the Airoli–Mulund Creek Bridge.
The Ghansoli–Airoli Palm Beach Road Extension is designed to provide access towards the Airoli–Mulund Creek Bridge. The extension was redesigned to reach the Airoli-Mulund Creek Bridge area, with an elevated section used through the mangrove-sensitive portion.
The Ghansoli–Airoli extension is being constructed to improve connectivity between Ghansoli and Airoli, provide an alternative route for traffic using the Thane–Belapur Road corridor, and improve access towards the Airoli–Mulund Creek Bridge and other regional road connections.
Palm Beach Road, also known as Palm Beach Marg, is the established name of the approximately 10 km six-lane road corridor in Navi Mumbai. 'Palm Beach Expressway' is commonly used as a search term for this corridor and its associated extension projects, but it should not be confused with the separate 3.47 km Ghansoli–Airoli extension.
The existing Palm Beach Road corridor is a six-lane road. The separate Ghansoli–Airoli extension is a new road and elevated bridge project with an approximately 1.9 km elevated section.
The existing Palm Beach Road corridor connects the Vashi and Belapur areas through Sanpada and Nerul, with Seawoods and CBD Belapur among the associated locations along the corridor. The Ghansoli–Airoli extension is being developed to improve connectivity towards Airoli.
Related Infrastructure Projects
Airoli Katai Naka Phase 3
A key 6.5 km arterial connection between Airoli (Thane) and Katai Naka (Dombivli) via Parsik Hill tunnel.
View Project →JNPT Expressway
A planned or under-construction logistics corridor to improve container transit movements near JNPT Port.
View Project →Pagote Chowk Expressway
A critical road connectivity project connecting Pagote near Navi Mumbai to Chowk near the Mumbai-Pune Expressway, streamlining transit.
View Project →Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.