Advertisement // Sponsor
Verified PartnerJNPT Expressway Route Map, Status & Latest Updates (2026)
The JNPT Expressway, also known as the JNPT Road Project and JNPT Connectivity Project, is a strategic freight connectivity corridor designed to improve access between Jawaharlal Nehru Port, Mumbai Metropolitan Region and the national highway network. This page tracks the JNPT Expressway route map, alignment, package-wise progress, contractors, construction status and latest project updates.
Recent developments highlight that Pune's elevated roads to use Malaysian UHPFRC tech, will need fewer pillars: Gadkari. In other updates, big Infra Boost For Maharashtra! Delhi -Mumbai Expressway Link To Mumbai -Pune Expressway Revived, and delhi Mumbai Expressway set to open by December 2025; Here's all you need to know.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
JNPT Expressway Route Map & Port Connectivity
Explore the interactive route alignment of the JNPT Expressway connecting Jawaharlal Nehru Port (Nhava Sheva) with NH-348, NH-48, Atal Setu (MTHL), and the Mumbai–Pune Expressway.
Advertisement // Sponsor
Verified Partner
Advertisement // Sponsor
Verified PartnerJNPT ExpresswayCost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| Lanes | 6 to 8 Lanes (With Dedicated Service Roads & Interchanges) |
| Ending Point | Palaspe Phata / Kalamboli / Mumbai–Pune Expressway & NH-48 Junction |
| Project Name | JNPT Expressway (JNPT Port Connectivity Corridor) |
| Total Length | 28 km (Multi-lane Port Freight Corridor & Spurs) |
| Current Status | Under Construction / Execution |
| Estimated Cost | ~₹3,000 Crore |
| Region Covered | Uran, Panvel & Navi Mumbai (Raigad District, Maharashtra) |
| Starting Point | Jawaharlal Nehru Port Trust (JNPT / Nhava Sheva), Uran, Navi Mumbai |
| Target Completion | 2027 |
| Expected Completion | 2027 |
| Implementing Agency | National Highways Authority of India (NHAI) |
| Implementing Authority | NHAI |
Key Nodes & Interchanges on JNPT Expressway
The corridor integrates five major national and state high-speed arteries serving the Mumbai Metropolitan Region.
Direct grade-separated access to container terminals, CFS yards, and JNPT SEZ.
Cloverleaf interchange linking JNPT traffic directly onto Atal Setu (Mumbai Trans Harbour Link) toward South Mumbai.
Connects with Mumbai–Goa Highway (NH-66) and the upcoming Pagote–Chowk Greenfield Expressway.
Links container traffic to the Mumbai–Pune Expressway, NH-48, and the Delhi–Mumbai Expressway JNPT Spur.
Executed by NHAI in partnership with JNPA (Mumbai Port/JNPT SPV).
JNPT Expressway Route & Logistics Corridors
The JNPT Expressway (JNPT Connectivity Project) spans ~28 km across NH-348, NH-348A, and NH-548 in Raigad district (Navi Mumbai), connecting the Jawaharlal Nehru Port container terminals at Nhava Sheva/Uran via Chirle (Atal Setu MTHL interchange), Dastan Phata, Jasai, Karjade, Palaspe Phata (NH-66 Mumbai–Goa Highway), and Kalamboli Junction (Mumbai–Pune Expressway & Sion–Panvel Highway), along with direct integration into the 92 km Vadodara–Mumbai Expressway (Delhi–Mumbai Expressway) JNPT spur.
Port Container Evacuation & Travel Time Impact
Eliminates multi-hour truck bottlenecks around Uran, Jasai, Palaspe, and Kalamboli, cutting port evacuation times between JNPT and the Mumbai–Pune / Delhi–Mumbai expressways to under 25 minutes.
JNPT Expressway (JNPT Connectivity Project) Overview
The JNPT Expressway is a strategic 6-to-8 lane port connectivity corridor developed by NHAI in Navi Mumbai (Raigad district) at an estimated cost of ~₹3,000 crore. While much of the core NH-348 / NH-548 widening is operational, elevated interchanges at Kalamboli and integration works with the Delhi–Mumbai Expressway JNPT Spur and Pagote–Chowk Expressway are actively under construction for full completion by 2027.
जेएनपीटी एक्सप्रेसवे (JNPT Expressway in Hindi)
जेएनपीटी एक्सप्रेसवे नवी मुंबई में जवाहरलाल नेहरू पोर्ट (JNPT / न्हावा शेवा) को अटल सेतु (MTHL), मुंबई–पुणे एक्सप्रेसवे, मुंबई–गोवा हाईवे और दिल्ली–मुंबई एक्सप्रेसवे से जोड़ने वाला 28 किमी लंबा रणनीतिक मालवाहक और यात्री कॉरिडोर है।
Advertisement // Sponsor
Verified PartnerLatest Developments
Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
The JNPT Expressway is the commonly used name for the approved 6-lane, access-controlled greenfield high-speed National Highway connecting JNPA Port at Pagote with Chowk in Maharashtra. The official government description identifies it as the JNPA Port (Pagote) to Chowk highway rather than formally naming it the JNPT Expressway.
The JNPT Expressway project is a 29.219 km greenfield highway planned to provide a direct high-capacity connection from JNPA Port to the national highway network at Chowk. The Union Cabinet approved the project on 19 March 2025 under the Build, Operate and Transfer (BOT-Toll) model with a total capital cost of ₹4,500.62 crore.
The JNPT Expressway route runs from JNPA Port at Pagote on NH-348 to Chowk on NH-48 in Maharashtra. The corridor is also planned to connect with the Mumbai–Pune Expressway and NH-66, providing a direct high-capacity route for port and commercial traffic.
The JNPT Expressway starts at JNPA Port on NH-348 near Pagote village and ends at Chowk on NH-48. Its planned connections with the Mumbai–Pune Expressway and Mumbai–Goa National Highway NH-66 give the corridor access to the wider regional highway network.
The approved JNPT Expressway is 29.219 km long. It is planned as a 6-lane, access-controlled greenfield high-speed National Highway.
The JNPT Expressway map shows the 29.219 km alignment between JNPA Port at Pagote and Chowk on NH-48. The official project map also shows its connectivity with the Mumbai–Pune Expressway and NH-66 and the two planned tunnels through the Sahyadri range.
The approved alignment begins at JNPA Port on NH-348 at Pagote village and terminates at the Mumbai–Pune Highway on NH-48 at Chowk. The corridor includes two tunnels through the Sahyadri range so that commercial vehicles can avoid the existing ghat terrain. A more detailed village-by-village alignment should not be stated unless supported by an official detailed alignment document.
The approved capital cost of the JNPT Expressway is ₹4,500.62 crore. The Union Cabinet approved this amount for the 29.219 km JNPA Port–Chowk project on 19 March 2025, with development planned under the BOT-Toll model.
The JNPT Expressway is designed to provide a more direct connection between JNPA Port and NH-48, the Mumbai–Pune Expressway and NH-66. The project is intended to improve logistics efficiency and facilitate safer and more efficient freight movement, particularly for container traffic from JNPA.
The project was approved to address highway congestion affecting traffic leaving JNPA Port toward NH-48 and the Mumbai–Pune Expressway. The government cited congestion around Palaspe Phata, D-Point, Kalamboli Junction and Panvel as a reason for developing a more direct port connection. The corridor is also intended to strengthen connectivity with Navi Mumbai International Airport.
The JNPT Expressway is planned as a 29.219 km, 6-lane, access-controlled greenfield highway. Two tunnels through the Sahyadri range are included in the project to avoid a ghat section and facilitate the movement of large commercial and container vehicles.
The JNPT Expressway is an approved project in the implementation process. The Union Cabinet approved the 29.219 km JNPA Port–Chowk highway in March 2025. Current publicly available information does not establish that the entire corridor has entered active civil construction, so it should not be described as an operational or completed expressway.
The project has received approval for construction, but a verified public announcement confirming the commencement of full-scale civil construction of the 29.219 km corridor has not been established. Therefore, the project is best described as approved and progressing through implementation rather than being presented as an already operational or substantially completed highway.
The key confirmed development remains the Union Cabinet approval dated 19 March 2025 for the 29.219 km JNPA Port–Chowk highway. The approved project has a ₹4,500.62 crore capital cost, 6-lane access-controlled configuration and two Sahyadri tunnels. Recent infrastructure coverage continues to identify the corridor as an upcoming freight-connectivity project rather than an operational expressway.
The JNPA Port–Chowk highway is a National Highway project under the Ministry of Road Transport and Highways framework and was approved for development on a Build, Operate and Transfer (BOT-Toll) basis. The publicly confirmed project approval does not by itself establish a specific construction contractor, so an individual contractor should not be named without a verified contract or award announcement.
The JNPT Connectivity Project is another name for the 28 km high-capacity road network upgrades (NH-348, NH-348A, NH-548, and Kalamboli/Chirle interchanges) supporting Jawaharlal Nehru Port transport routes in Navi Mumbai.
जेएनपीटी एक्सप्रेसवे जवाहरलाल नेहरू पोर्ट ट्रस्ट (नवी मुंबई) के पास लॉजिस्टिक्स और मालवाहक कनेक्टिविटी को बेहतर बनाने के लिए विकसित की जा रही एक प्रमुख सड़क परियोजना है।
Related Infrastructure Projects
Virar Alibaug Multimodal Corridor
A planned 8-lane expressway combining rapid transit, highways, and utility lines, connecting Virar to Alibaug to ease congestion in MMR.
View Project →Orange Gate to Marine Drive Twin Tunnel
A 9.3 km project linking Eastern Freeway's Orange Gate node to Marine Drive on the western shoreline.
View Project →CIDCO Coastal Road
A 9.6 km coastal expressway section under active construction by CIDCO to improve port connectivity.
View Project →Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.
