Advertisement // Sponsor
Verified PartnerKonkan Expressway Route Map, Status & Latest Updates (2026)
The Konkan Expressway, also known as the Konkan Greenfield Expressway and Mumbai Goa Expressway, is a proposed high-speed access-controlled corridor connecting Mumbai and Goa through Maharashtra's Konkan region. It plays a critical role alongside other major state projects like the Pune Ring Road, Pune Nashik Expressway, Virar Alibaug Multimodal Corridor, Mumbai Coastal Road and the Delhi Mumbai Expressway in transforming regional logistics.
This page tracks the Konkan Expressway Route Map, alignment, package-wise progress, land acquisition status, contractors, construction updates, expected completion timeline and latest project news.
The Indian government has accelerated the development of the Konkan Expressway, with Minister Eknath Shinde aiming for its expedited completion. The Public Works Department (PWD) has drafted a plan for the construction of this coastal road between Raigad and Sindhudurg. Additionally, the Maharashtra Government has obtained environmental clearance for the project worth Rs 70,000 crore and cleared land acquisition for the INR 80,000 crore Shaktipeeth Expressway, which is expected to link 12 districts and boost rural development. The Mumbai-Goa Marine Superhighway project, originally planned parallel to the existing Goa highway, has begun construction after several delays. However, ongoing heavy rains have caused traffic disruptions in some sections of the road, particularly during festivals. Construction on key bypasses for Konkan Expressway is expected to be completed before monsoon season begins.
कोकण एक्सप्रेसवे (Mumbai Goa Expressway)
कोकण एक्सप्रेसवे, जिसे कोकण ग्रीनफील्ड एक्सप्रेसवे और मुंबई गोवा एक्सप्रेसवे भी कहा जाता है, महाराष्ट्र के कोकण क्षेत्र में प्रस्तावित एक महत्वपूर्ण हाई-स्पीड एक्सप्रेसवे परियोजना है।
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Konkan Expressway (Mumbai–Goa Expressway) Route Map
Explore the proposed 388 km greenfield alignment of the Konkan Expressway along Maharashtra's scenic coast from Panvel/Chirle (Navi Mumbai) through Raigad, Ratnagiri, and Sindhudurg to the Goa border.
Advertisement // Sponsor
Verified Partner
Advertisement // Sponsor
Verified PartnerKonkan ExpresswayCost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| Lanes | 6 Lanes |
| Ending Point | Patradevi (Sindhudurg district, Maharashtra–Goa Border) |
| Project Name | Konkan Expressway (Konkan Greenfield Expressway / Mumbai–Goa Expressway) |
| Total Length | 388 km (Access-Controlled Coastal Greenfield Corridor) |
| Current Status | Tendering & Land Acquisition Stage |
| Estimated Cost | ~₹70,000 Crore (₹68,000–₹70,000 Crore) |
| Starting Point | Chirle / Panvel (Navi Mumbai, near Atal Setu MTHL) |
| Districts Covered | Raigad, Ratnagiri, Sindhudurg (3 Konkan Coastal Districts) |
| Target Completion | Mid 2030s |
| Expected Completion | Mid 2030s |
| Implementing Agency | Maharashtra State Road Development Corporation (MSRDC) |
| Implementing Authority | MSRDC |
| Major Engineering Features | 41 Tunnels (~91 km total) & 27 Major Bridges/Viaducts across Konkan creeks |
Districts Covered by Konkan Expressway
The expressway traverses 3 coastal districts of Maharashtra across 14 talukas, featuring 14 major interchanges.
Starts near Chirle/Panvel and passes through Pen, Alibaug, Murud, Roha, Mangaon, and Srivardhan.
Connects Mandangad, Dapoli, Guhagar, Ratnagiri, Lanja, and Rajapur with major creek bridges and Western Ghats foothills tunnels.
Traverses Devgad, Kankavli, Malvan, Kudal, Vengurla, and Sawantwadi up to Patradevi at the Goa border.
Includes ~41 tunnels and 27 major creek/river bridges engineered for heavy Konkan monsoon terrain.
Konkan Expressway Route Alignment & Districts Covered
The 388 km 6-lane access-controlled Konkan Greenfield Expressway starts near Chirle/Panvel in Navi Mumbai (connecting with Atal Setu / MTHL and the Mumbai–Pune Expressway) and runs parallel to the Arabian Sea coast through Pen, Alibaug, Roha, and Srivardhan in Raigad district; Dapoli, Guhagar, Ratnagiri, and Rajapur in Ratnagiri district; and Devgad, Malvan, Vengurla, and Sawantwadi in Sindhudurg district, terminating at Patradevi on the Maharashtra–Goa border near Mopa Airport.
Mumbai to Goa Travel Time Reduction
Once completed, the 6-lane access-controlled Konkan Expressway will cut road travel time between Mumbai/Navi Mumbai and Goa from 12–14 hours on NH-66 down to 5–6 hours.
Konkan Expressway (Mumbai–Goa Greenfield Expressway) Overview
The Konkan Expressway (also known as the Konkan Greenfield Expressway or Mumbai–Goa Expressway) is a 388 km, 6-lane access-controlled expressway proposed by the Maharashtra State Road Development Corporation (MSRDC) at an estimated cost of ~₹70,000 crore. Designed to unlock tourism, port logistics, and horticulture across Raigad, Ratnagiri, and Sindhudurg, the project is currently in the DPR, coastal regulation zone (CRZ)/environmental clearance, and initial land acquisition stage.
कोकण एक्सप्रेसवे (Konkan Expressway in Hindi / Marathi)
कोकण एक्सप्रेसवे महाराष्ट्र के नवी मुंबई (चिरले/पनवेल) और गोवा बॉर्डर (पत्रादेवी, सिंधुदुर्ग) को जोड़ने वाला 388 किलोमीटर लंबा प्रस्तावित 6-लेन ग्रीनफील्ड एक्सप्रेसवे कॉरिडोर है। यह रायगड, रत्नागिरी और सिंधुदुर्ग जिलों से होकर गुजरेगा और मुंबई से गोवा की यात्रा का समय 12 घंटे से घटाकर मात्र 5 से 6 घंटे कर देगा।
Advertisement // Sponsor
Verified PartnerLatest Developments
Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
The Konkan Expressway is a proposed six-lane, access-controlled greenfield expressway being developed by the Maharashtra State Road Development Corporation (MSRDC). It is planned to provide a high-speed connection along Maharashtra's Konkan region between the Panvel area and the Maharashtra-Goa border at Patradevi.
The latest reported route runs from Shahbaj/Chirle in the Panvel region of Raigad district southward through the Konkan region to Patradevi on the Maharashtra-Goa border. The corridor passes through Raigad, Ratnagiri and Sindhudurg districts and is planned to connect with the wider regional expressway network.
The northern end is planned near Shahbaj in the Panvel area, with connectivity to the Virar-Alibag Multimodal Corridor. The southern end is at Patradevi on the Maharashtra-Goa border. The exact northern connection terminology varies between earlier and revised project documents.
The revised alignment is approximately 389 km long and passes through Raigad, Ratnagiri and Sindhudurg. MSRDC has been reworking parts of the alignment to address Western Ghats Eco-Sensitive Zone constraints, so detailed village-level alignment should be taken from the latest approved project documents rather than older route maps.
The revised mainline length is approximately 389 km. Earlier project documents referred to about 376 km, but the revised Detailed Project Report increased the mainline scope to approximately 389 km. Additional connecting and spur roads are separate from the mainline length.
The Konkan Expressway map covers the planned Panvel/Shahbaj–Patradevi corridor through Raigad, Ratnagiri and Sindhudurg. Because the alignment has been revised in response to environmental constraints, the latest MSRDC alignment should be used for an accurate project map rather than older 376 km route maps.
Earlier project documents and reports cited an estimated cost of about ₹68,720 crore, including land acquisition. However, the revised project cost should be treated cautiously because the alignment and environmental-clearance process have evolved, and a newer final sanctioned project cost has not been clearly established in the latest publicly available records.
Full-scale construction has not started. The project remains in the pre-construction stage, with the revised DPR prepared and environmental and alignment-related approvals still affecting implementation. Construction contractors for the main expressway have not been established as a completed award.
The Konkan Expressway remains a proposed MSRDC greenfield project in the pre-construction stage. The revised DPR was prepared with an approximately 389 km alignment, while environmental clearance and alignment finalisation remain important steps before full-scale construction can proceed.
Recent project information continues to place the Konkan Expressway in the pre-construction stage. MSRDC's revised DPR and environmental-clearance process remain central to the project, while parts of the alignment have been reviewed to address Western Ghats Eco-Sensitive Zone constraints. No reliable full-project construction start or completion date has been established.
The proposed Konkan Expressway passes through three Maharashtra districts: Raigad, Ratnagiri and Sindhudurg. The project is planned as a major north-south access-controlled corridor along the Konkan region.
The northern end is planned to connect with the Virar-Alibag Multimodal Corridor, while the southern end reaches Patradevi at the Maharashtra-Goa border. The expressway is also intended to complement NH-66 and improve high-speed connectivity between the Mumbai Metropolitan Region, Konkan and Goa.
Yes. Konkan Expressway is commonly referred to as the Mumbai Goa Expressway or Konkan Greenfield Expressway because it provides a high-speed 6-lane access-controlled corridor between Navi Mumbai and the Goa border.
Konkan Greenfield Expressway is the official MSRDC project name for the 388 km 6-lane coastal expressway from Chirle (Navi Mumbai) to Patradevi (Sindhudurg/Goa border).
कोकण एक्सप्रेसवे महाराष्ट्र के मुंबई और गोवा को जोड़ने वाला 388 किमी लंबा प्रस्तावित 6-लेन ग्रीनफील्ड एक्सप्रेसवे कॉरिडोर है।
Related Infrastructure Projects
Mumbai Coastal Road
A 29.2 km coastal route utilizing undersea tunnels and reclaimed land along Mumbai's western coastline.
View Project →Delhi Mumbai Expressway
India's massive 1,350 km greenfield expressway reducing capital-to-financial hub transit down to 12 hours.
View Project →Pune Ring Road
A premium 136.8 km outer circular ring bypass road easing logistics transit surrounding Pune metropolis.
View Project →Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.
