Advertisement // Sponsor
Verified PartnerMumbai Eastern Freeway Route Map, Toll Rates, Length, Tunnels, Status & Latest Updates (2026)
The Mumbai Eastern Freeway is an approximately 16.8 km, 4-lane access-controlled urban arterial expressway corridor built by the Mumbai Metropolitan Region Development Authority (MMRDA) under the Mumbai Urban Infrastructure Project (MUIP). Connecting S.V. Patel Junction (Orange Gate on P D'Mello Road in South Mumbai) to the Mankhurd–Ghatkopar Link Road in Ghatkopar East, the corridor incorporates a 9.29 km elevated road section to Anik, approximately 500 m twin road tunnels beneath BARC Hill (the first of their kind in Mumbai), and elevated viaduct links into the eastern suburbs.
Operating completely toll-free since its opening in June 2013 (with the final Panjarpol–Ghatkopar section opening on 16 June 2014), the Mumbai Eastern Freeway offers substantial travel time savings between South Mumbai and the suburbs, with exact commute durations depending on origin, destination, and prevailing traffic conditions. MMRDA is actively extending this vital arterial network via two flagship mega-projects: the under-construction 4.9 km Orange Gate–Marine Drive Underground Tunnel (built by L&T at ₹8,056 Crore) connecting directly to the Mumbai Coastal Road, and the 13.90 km Eastern Freeway Extension to Thane (awarded to Navayuga Engineering Company Limited at ₹2,682 Crore).
"The Mumbai Eastern Freeway is an approximately 16.8 km 4-lane access-controlled urban arterial expressway connecting S.V. Patel Junction (Orange Gate, South Mumbai) to the Mankhurd–Ghatkopar Link Road in Ghatkopar East. Developed by MMRDA under MUIP, the corridor features a 9.29 km elevated road section to Anik, approximately 500 m twin road tunnels beneath BARC Hill (first of their kind in Mumbai), and elevated suburban links. Operating 100% toll-free since its opening in June 2013, the freeway is being extended northward via the 13.90 km Eastern Freeway Extension to Thane (awarded to Navayuga Engineering) and connected to the Mumbai Coastal Road via the 4.9 km Orange Gate–Marine Drive Underground Tunnel (built by L&T)."
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Advertisement // Sponsor
Verified PartnerMumbai Eastern Freeway Route Map & Route Sections
Navigate the interactive Eastern Freeway route map to examine the continuous approximately 16.8 km alignment. The Mumbai Eastern Freeway route is engineered into three distinct administrative sections:
- Part I (9.29 km):Continuous 4-lane elevated road from S.V. Patel Junction (Orange Gate / P D'Mello Road) to the start of the Anik–Panjarpol Link Road, traversing Reay Road, Sewri, and Wadala.
- Part II (4.30 km): Anik to Panjarpol Link Road (APLR) featuring approximately 500 m twin road tunnels beneath BARC Hill in Trombay, the first of their kind in Mumbai.
- Part III (2.81 km): Panjarpol–Ghatkopar Link Road (PGLR) elevated viaduct connecting Panjarpol Junction to the Mankhurd–Ghatkopar Link Road at Chheda Nagar in Ghatkopar East.
Advertisement // Sponsor
Verified PartnerEastern Freeway Length, Elevated Road & BARC Twin Tunnels
| Parameter | Technical & Administrative Details |
|---|---|
| Official Corridor Name | Mumbai Eastern Freeway (पूर्व मुक्तमार्ग - MMRDA) |
| Eastern Freeway Length | Approximately 16.8 km (MMRDA general overview cites 16.6 km, while individual civil components total approximately 16.79 km: Part I 9.29 km, Part II 4.30 km, and Part III 2.81 km) |
| Elevated Road Section | 9.29 km 4-lane elevated viaduct from S.V. Patel Junction (Orange Gate) to the start of the Anik–Panjarpol Link Road |
| BARC Hill Twin Tunnels | Twin road tunnels beneath BARC Hill (approximately 500 m in length), described by MMRDA as the first of their kind in Mumbai |
| Carriageway Configuration | 4 Lanes Divided Dual Carriageway (2 lanes each direction) + Dual 2-Lane Rock-Cut Tunnels |
| Southern Terminal (South Mumbai) | S.V. Patel Junction / Orange Gate on P D'Mello Road (near Dockyard Road & CSMT) |
| Northern Terminal (Eastern Suburbs) | Mankhurd–Ghatkopar Link Road (MGLR), Chheda Nagar, Ghatkopar East (connecting Eastern Express Highway & Thane Extension) |
| Nodal Authority & Funding | Mumbai Metropolitan Region Development Authority (MMRDA) under Mumbai Urban Infrastructure Project (MUIP) |
| MMRDA Section-Wise Costs | Part I: ₹531 Crore sanctioned / ₹749 Crore revised expected • Part II: ₹221 Crore • Part III: ₹168 Crore sanctioned / ₹293.87 Crore revised (Reported total outlay: ~₹1,436 Crore) |
| Civil Section Contractors | Part I: Simplex Infrastructures Ltd. • Part II: Madhucon Projects Ltd. • Part III: J Kumar Infraprojects Ltd. |
| Opening & Inauguration Timeline | First phase (Parts I & II) opened June 2013 (inaugurated 13 June 2013) • Final section (Panjarpol to Ghatkopar) opened 16 June 2014 |
| Toll Status | 100% Toll-Free (Operated toll-free since its opening in June 2013 for all permitted vehicles) |
| Traffic Regulations & Advisory | Regulated and enforced by Mumbai Traffic Police according to official notifications, electronic surveillance, and posted road signage. |
Eastern Freeway Traffic Updates & Road Closures Today
Real-Time Traffic Report & Daily Commutes
Live Eastern Freeway Traffic AdvisoryBefore travelling, commuters can verify a live traffic report Eastern Freeway on real-time navigation platforms such as Google Maps and Mappls to detect congestion near S.V. Patel Junction, Wadala ramps, or Chheda Nagar. Peak-hour flow varies significantly based on weather conditions, harbour traffic, and connecting corridor bottlenecks.
Maintenance & Eastern Freeway Closure Today
Night Blocks & Planned MaintenancePeriodic maintenance, joint replacements, surfacing repairs, and lighting upgrades in the BARC twin tunnels are regularly scheduled during night hours (11:00 PM to 06:00 AM (Night Blocks)). Check official announcements if seeking information regarding an Eastern Freeway closure today, as full closures are rare and usually limited to specific carriageway repairs with surface diversions via P D'Mello Road and Eastern Express Highway.
Mumbai Eastern Freeway Toll Status & Vehicle Policy
16.8 km Orange Gate to Ghatkopar Corridor (MMRDA 100% Toll-Free Public Viaduct)
The Eastern Freeway is a 16.8 km access-controlled expressway built by MMRDA under the Mumbai Urban Infrastructure Project (MUIP). It connects S.V. Patel Road (Orange Gate) in South Mumbai directly to Ghatkopar East and the Eastern Express Highway via a 9.29 km elevated viaduct and India's first urban twin tunnels beneath BARC Hill. Funded entirely by public tax revenues, the freeway is completely toll-free with zero user fee charged since opening in June 2013. Two-wheelers, three-wheelers, and heavy goods vehicles are prohibited for passenger safety.
Corridor Facilities & Alignment Scope
16.8 km Toll-Free Viaduct| No. | Fee Plaza / Facility | Chainage / Section | District / State | Classification | Role & Corridor Scope |
|---|---|---|---|---|---|
| 1 | Orange Gate to Ghatkopar Corridor | Km 0 to Km 16.8 | Maharashtra | Toll-Free Urban Viaduct | Continuous grade-separated urban elevated expressway with BARC twin tunnels; 100% toll-free for passenger cars. |
Calculate Exact Toll Rates & Journey Price
Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.
Eastern Freeway Extension to Thane: Route, Length & Construction Status
Eastern Freeway Extension to Thane (Chheda Nagar (Ghatkopar) to Anand Nagar (Thane))
MMRDA is constructing the 13.9 km, 6 Lanes (3+3) elevated Eastern Freeway Extension from Chheda Nagar in Ghatkopar directly to Anand Nagar in Thane along the Eastern Express Highway corridor. The extension will decongest arterial chokepoints across Chembur, Ghatkopar, Vikhroli, Bhandup, Mulund, and the Thane toll naka.
Orange Gate–Marine Drive Underground Twin Tunnel
MMRDA has undertaken the 4.9 km (including approaches, cut-and-cover, and ramps) Orange Gate to Marine Drive Underground Twin Tunnel to establish signal-free coast-to-coast connectivity across Mumbai's southern peninsula. Featuring 3.71 km and 3.73 km TBM bored twin road tunnels beneath railway tracks and urban density, it links the Eastern Freeway directly to Marine Drive and the Mumbai Coastal Road.
Key Interchanges, Exits & Landmarks Along the Route
Orange Gate / S.V. Patel Junction Terminal (South Mumbai)
Southern terminus of Mumbai Eastern Freeway at S.V. Patel Junction on P D'Mello Road near Orange Gate (Mumbai Port Trust). Future take-off junction for the 4.9 km Orange Gate–Marine Drive Tunnel connecting to Mumbai Coastal Road.
Reay Road & Sewri Elevated Viaduct
Part of the 9.29 km elevated road spanning over Mumbai Port Trust railway lines and harbour industrial precincts, bypassing chronic surface bottlenecks across Reay Road and Sewri.
Wadala Truck Terminal & Bhakti Park Interchange
Grade-separated exit and entry ramps serving Wadala Truck Terminal, MMRDA Monorail Depot, Bhakti Park, and Anik Depot, connecting central Mumbai harbour residential hubs.
Anik Junction (Chembur West)
End of the 9.29 km continuous elevated viaduct from S.V. Patel Junction and transition onto the at-grade Anik–Panjarpol Link Road (APLR), connecting traffic towards Chembur West and Mahul.
BARC Hill Twin Tunnels (Trombay)
Approximately 500 m long twin road tunnels bored beneath the Bhabha Atomic Research Centre (BARC) Hill, described by MMRDA as the first of their kind in Mumbai, bypassing arterial hill-skirting congestion.
Panjarpol Junction Interchange (Chembur East)
Trumpet interchange linking the Anik–Panjarpol Link Road with the Panjarpol–Ghatkopar Link Road (PGLR), Eastern Express Highway (EEH), and Sion–Panvel Highway.
Govandi & Shivaji Nagar Elevated Viaduct
Elevated viaduct spanning over Govandi, Shivaji Nagar, and Indian Oil junction, bypassing congested surface intersections along Mumbai's eastern periphery.
Ghatkopar Terminal (MGLR / Chhatrapati Shivaji Maharaj Chowk)
Northern terminus at Chheda Nagar / Mankhurd–Ghatkopar Link Road in Ghatkopar East, connecting to the Eastern Express Highway. Serves as the origin point for the 13.90 km Eastern Freeway Extension to Thane.
Civil Engineering Packages & Contractors
Part I: Elevated Road from S.V. Patel Junction (Orange Gate) to Anik
9.29 km 4-lane continuous elevated viaduct extending from S.V. Patel Junction along P D'Mello Road and harbour lines to the start of Anik–Panjarpol Link Road. MMRDA cost: ₹531 Crore sanctioned / ₹749 Crore revised expected outlay. Built by Simplex Infrastructures.
Part III: Panjarpol to Ghatkopar (Panjarpol–Ghatkopar Link Road Viaduct)
2.81 km 4-lane elevated viaduct (PGLR) from Panjarpol Junction to Mankhurd–Ghatkopar Link Road near Chhatrapati Shivaji Maharaj Chowk, Ghatkopar East. Opened on 16 June 2014. MMRDA cost: ₹168 Crore sanctioned / ₹293.87 Crore revised. Built by J Kumar Infraprojects.
Part II: Anik to Panjarpol Link Road & BARC Hill Twin Tunnels
4.30 km at-grade and elevated dual carriageway including approximately 500 m twin road tunnels beneath BARC Hill (the first of their kind in Mumbai). MMRDA cost: ₹221 Crore. Built by Madhucon Projects.
Advertisement // Sponsor
Verified PartnerMumbai Eastern Freeway Latest News & Project Updates
Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
Yes, the Mumbai Eastern Freeway is completely toll-free for all permitted vehicles and has been toll-free since its opening in June 2013. Built and maintained by MMRDA under the MUIP, no toll is charged along its approximately 16.8 km length from Orange Gate in South Mumbai to Ghatkopar East.
The Mumbai Eastern Freeway has an approximate total length of 16.8 km (MMRDA general overview notes 16.6 km, while component lengths total approximately 16.79 km). The route begins at S.V. Patel Junction on P D'Mello Road (Orange Gate, South Mumbai), runs along a 9.29 km elevated road to Anik, traverses approximately 500 m twin road tunnels beneath BARC Hill to Panjarpol, and continues along an elevated viaduct to the Mankhurd–Ghatkopar Link Road in Ghatkopar East.
Commuters can monitor live Eastern Freeway traffic updates and traffic reports using real-time navigation tools such as Google Maps and Mappls, as well as official advisories from the Mumbai Traffic Police (@MTPHereToHelp). Periodic lane maintenance, monsoon repairs, and traffic diversions are communicated through official traffic notifications.
The Eastern Freeway Extension to Thane is a 13.90 km, 6-lane (3+3) elevated corridor being built by MMRDA from Chheda Nagar in Ghatkopar to Anand Nagar in Thane. The approved project cost is ₹3,314.40 Crore (accepted contract amount ₹2,682 Crore) with Navayuga Engineering Company Limited as the contractor. As of MMRDA 2026 reporting, physical progress is 17.63% and financial progress is 17.09%. Unlike the existing freeway, a toll plaza is proposed near Navghar Flyover.
The BARC twin tunnels are approximately 500 m long twin road tunnels bored beneath BARC Hill in Trombay, described by MMRDA as the first of their kind in Mumbai. Each tunnel carries two lanes of traffic with forced ventilation and emergency lighting, grade-separating commuter traffic between Anik and Panjarpol.
The Mumbai Eastern Freeway was developed by MMRDA across three civil parts: Part I (9.29 km elevated road from S.V. Patel Junction to Anik) was built by Simplex Infrastructures (₹531 Cr sanctioned / ₹749 Cr revised); Part II (Anik to Panjarpol and BARC tunnels) was built by Madhucon Projects (₹221 Cr); and Part III (Panjarpol to Ghatkopar) was built by J Kumar Infraprojects (₹168 Cr sanctioned / ₹293.87 Cr revised). The total project outlay is widely reported at approximately ₹1,436 Crore.
The freeway was opened in two phases: the first phase from Orange Gate to Panjarpol (Parts I and II) was inaugurated on 13 June 2013 and opened to the public in June 2013; the final phase from Panjarpol to Ghatkopar (Part III) opened to traffic on 16 June 2014.
MMRDA is constructing the ₹8,056 Crore Orange Gate–Marine Drive Underground Twin Tunnel with contractor Larsen & Toubro (L&T). The 4.9 km project features 3.71 km and 3.73 km TBM bored tunnels beneath South Mumbai. As of September 2026, MMRDA reported 33.27% physical and 27.04% financial progress. Once completed, it will link the Eastern Freeway directly to Marine Drive and the Mumbai Coastal Road.
Related Infrastructure Projects
Mumbai Coastal Road
A 29.2 km coastal route utilizing undersea tunnels and reclaimed land along Mumbai's western coastline.
View Project →Mumbai Coastal Road Network
An integrated ~110-140 km coastal freeway corridor combining 4 megaprojects along Mumbai's western seafront.
View Project →Pune Mumbai Expressway
A 94.5 km 6-lane access-controlled concrete toll expressway developed by MSRDC connecting Mumbai and Pune, featuring the landmark 13.3 km Missing Link bypass.
View Project →Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.
