Advertisement // Sponsor

Verified Partner
Loading sponsor...
METRO CORRIDOR DOSSIER // MANIK-BAUG-SNDT-METRO

Manik Baug SNDT Metro Route Map, Stations & Status

Proposed & Review Stages📏 6.2 km🚉 6 Stations🗓 Target 2030🏢 Maha Metro

Proposed Line 4A Spur line linking Manik Baug to SNDT College on Karve Road, alleviating traffic blocks along Sinhagad Road and expanding network interchanges.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Manik Baug SNDT Metro Economics

Manik Baug SNDT Metro Economics

Total Investment₹2,200 Crores
Primary BackersJoint Government Equity
Operator / ModelPublic execution
Target Opening

Expected Completion Date

StatusProposed & Review Stages
Target Opening DateTarget 2030
Station list

Manik Baug SNDT Metro Stations

#StationTypeInterchange / ConnectionOpened
01
Warje
Terminal—2030
02
Daulat Nagar
Regular—2030
03
Karve Nagar
Regular—2030
04
Dahanukar Colony
Regular—2030
05
Karve Putala
Regular—2030
06
Nal Stop
TerminalAqua Line2030
Geospatial Alignment

Manik Baug SNDT Metro Route Map

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Specs sheet

Manik Baug SNDT Metro Technical Specifications

ParameterValue
Estimated Cost₹2,200 Crores
Corridor TypeElevated
Primary DepotKothrud Depot (Sharing)
Track GaugeStandard Gauge (1435 mm)
Total Length6.2 km
Opened / Est. OpeningTarget 2030
Corridor StatusProposed & Review Stages
Maximum Design Speed80 km/h
OperatorMaha Metro
Stations Count6
Line Number4A (Spur)
Electrification System25kV AC overhead catenary (OHE)
Chronological Milestones

Manik Baug SNDT Metro Timeline

2024

State Cabinet Approval of the spur proposal

2025

Geotechnical route survey

2030

Target Opening

Geospatial Explorer

Manik Baug SNDT Metro Alignment Map & GIS Explorer

Elevated / UndergroundElevated: 6.2 km | Underground: 0 km
Viaduct Length6.2 km
Tunnel Length0 km
River CrossingsNone
Major Bridges / CrossingsNone
Primary DepotKothrud Depot (Sharing)

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Answers

Frequently Asked Questions

The Manik Baug–SNDT Metro project is the Line 4A spur of Pune Metro Phase 2, planned to connect SNDT College (Nal Stop) with Warje and Manik Baug. The corridor is 6.12 km long with six elevated stations.

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Maharashtra Dashboard →MH
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement