Advertisement // Sponsor
Verified PartnerLoading sponsor...
METRO CORRIDOR DOSSIER // MANIK-BAUG-SNDT-METRO
Manik Baug SNDT Metro Route Map, Stations & Status
Proposed & Review Stages📏 6.2 km🚉 6 Stations🗓 Target 2030🏢 Maha Metro
Proposed Line 4A Spur line linking Manik Baug to SNDT College on Karve Road, alleviating traffic blocks along Sinhagad Road and expanding network interchanges.
FEATURED PARTNER
ADVERTISEMENTWant Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Manik Baug SNDT Metro Economics
Manik Baug SNDT Metro Economics
Total Investment₹2,200 Crores
Primary BackersJoint Government Equity
Operator / ModelPublic execution
Target Opening
Expected Completion Date
StatusProposed & Review Stages
Target Opening DateTarget 2030
Station list
Manik Baug SNDT Metro Stations
| # | Station | Type | Interchange / Connection | Opened |
|---|---|---|---|---|
| 01 | Warje | Terminal | — | 2030 |
| 02 | Daulat Nagar | Regular | — | 2030 |
| 03 | Karve Nagar | Regular | — | 2030 |
| 04 | Dahanukar Colony | Regular | — | 2030 |
| 05 | Karve Putala | Regular | — | 2030 |
| 06 | Nal Stop | Terminal | Aqua Line | 2030 |
Geospatial Alignment
Manik Baug SNDT Metro Route Map
Advertisement // Sponsor
Verified PartnerLoading sponsor...
Loading GIS Map Environment...
Advertisement // Sponsor
Verified PartnerLoading sponsor...
Specs sheet
Manik Baug SNDT Metro Technical Specifications
| Parameter | Value |
|---|---|
| Estimated Cost | ₹2,200 Crores |
| Corridor Type | Elevated |
| Primary Depot | Kothrud Depot (Sharing) |
| Track Gauge | Standard Gauge (1435 mm) |
| Total Length | 6.2 km |
| Opened / Est. Opening | Target 2030 |
| Corridor Status | Proposed & Review Stages |
| Maximum Design Speed | 80 km/h |
| Operator | Maha Metro |
| Stations Count | 6 |
| Line Number | 4A (Spur) |
| Electrification System | 25kV AC overhead catenary (OHE) |
Chronological Milestones
Manik Baug SNDT Metro Timeline
2024
State Cabinet Approval of the spur proposal
2025
Geotechnical route survey
2030
Target Opening
Geospatial Explorer
Manik Baug SNDT Metro Alignment Map & GIS Explorer
Elevated / UndergroundElevated: 6.2 km | Underground: 0 km
Viaduct Length6.2 km
Tunnel Length0 km
River CrossingsNone
Major Bridges / CrossingsNone
Primary DepotKothrud Depot (Sharing)
Advertisement // Sponsor
Verified PartnerLoading sponsor...
Advertisement // Sponsor
Verified PartnerLoading sponsor...
Answers
Frequently Asked Questions
The Manik Baug–SNDT Metro project is the Line 4A spur of Pune Metro Phase 2, planned to connect SNDT College (Nal Stop) with Warje and Manik Baug. The corridor is 6.12 km long with six elevated stations.
Advertisement // Sponsor
Verified PartnerLoading sponsor...
Enjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.
✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
