Advertisement // Sponsor

Verified Partner
Loading sponsor...
METRO CORRIDOR DOSSIER // KOLKATA-METRO-PINK-LINE

Kolkata Metro Line 5 (Pink Line — Baranagar ↔ Barrackpore Route & Status)

Approved / Pre-Construction📏 12.50 km Sanctioned Route (7.77 mi)🚉 11 Sanctioned Elevated Stations Stations🗓 Target Phased Opening: Phase 1🏢 Metro Railway, Kolkata (Owner: Indian Railways / RVNL)

Kolkata Metro Line 5 (Pink Line) is a sanctioned 12.50 km broad gauge elevated corridor with 11 planned stations (Baranagar, Kamarhati, Agarpara, Sodepur, Panihati, Sukchar, Khardaha, Tatagate, Titagarh, Talpukur, Barrackpore). Running along Barrackpore Trunk Road (BT Road), the line connects the North-South Line 1 hub at Baranagar to the historic suburban district at Barrackpore.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Kolkata Metro Line 5 (Pink Line) Economics

Kolkata Metro Line 5 (Pink Line) Economics

Project CostSanctioned Project Cost ₹2,069.60 Cr (US$250 million)
Primary Backers100% Ministry of Railways (Government of India)
Operator / ModelRail Vikas Nigam Limited (RVNL) Execution
Target Opening

Expected Completion Date

StatusApproved / Pre-Construction
Target Opening DateTarget Phased Opening: Phase 1 (Baranagar – Sodepur) | Phase 2 (Sodepur – Barrackpore)
Station list

Kolkata Metro Line 5 (Pink Line) Stations

#StationTypeInterchange / ConnectionOpened
01
Baranagar
Elevated Operational HubLine 1 Blue Line & Baranagar Road Railway Station22 Feb 2021
02
Krishna Kali (Kamarhati)
Elevated (Sanctioned)Kamarhati Suburb Node—
03
Acharya Prafulla Chandra (Agarpara)
Elevated (Sanctioned)Agarpara Suburb & BT Road Axis—
04
Gandhi Ashram (Sodepur)
Elevated (Sanctioned)Sodepur Commercial & Transit Node—
05
Sarat Chandra (Panihati)
Elevated (Sanctioned)Panihati Suburb Node—
06
Subhas Nagar (Sukchar)
Elevated (Sanctioned)Sukchar Precinct Node—
07
Rishi Bankim (Khardaha)
Elevated (Sanctioned)Khardaha Suburb Node—
08
Dr. Rajendra Prasad (Tatagate)
Elevated (Sanctioned)Tatagate Junction Node—
09
Shah Nawaz Khan (Titagarh)
Elevated (Sanctioned)Titagarh Industrial Precinct Node—
10
Anukul Thakur (Talpukur)
Elevated (Sanctioned)Talpukur Suburb Node—
11
Mangal Pandey (Barrackpore)
Elevated Terminal (Sanctioned)Barrackpore Railway Station Interchange—
Geospatial Alignment

Baranagar ↔ Barrackpore Alignment Map & BT Road Utility Diversion Plan

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Specs sheet

Kolkata Metro Line 5 (Pink Line) Technical Specifications

ParameterValue
Estimated Cost₹2,069 Cr
Corridor TypeElevated Viaduct along BT Road (Barrackpore Trunk Road)
Primary DepotBaranagar Depot / Noapara Main Depot
Track GaugeBroad Gauge (1,676 mm / 5 ft 6 in)
Total Length12.50 km Sanctioned Route (7.77 mi)
Opened / Est. OpeningTarget Phased Opening: Phase 1 (Baranagar – Sodepur) | Phase 2 (Sodepur – Barrackpore)
Corridor StatusApproved / Pre-Construction
Peak HeadwayTarget 8 – 10 min
OperatorMetro Railway, Kolkata (Owner: Indian Railways / RVNL)
Stations Count11 Sanctioned Elevated Stations
Daily RidershipProjected 350,000+ Daily Passengers along BT Road Corridor
Line NumberLine 5 (Pink Line)
Signalling SystemCBTC Signalling System
Rolling StockICF Standard & CRRC Dalian Broad Gauge AC Rakes
Maximum Operating Speed80 km/h Design Speed
Electrification System750V DC Third Rail
Chronological Milestones

Kolkata Metro Line 5 (Pink Line) Timeline

2009-10

Baranagar to Barrackpore Line 5 corridor sanctioned at ₹2,070 Cr by Railway Minister Mamata Banerjee.

2012

State government & KMC raised concerns regarding 6 massive arterial water pipelines (42 to 72-inch diameter) under BT Road.

RVNL Revision

RVNL submitted a revised micro-tunneling plan to lay a new 60-inch MS pipeline between Dunlop Bridge and Chiriamore to clear central pier locations.

Phased Execution

Phase 1 (Baranagar to Gandhi Ashram / Sodepur) and Phase 2 (Gandhi Ashram to Mangal Pandey / Barrackpore) planned for construction.

Proprietary analytics

Pink Line BT Road Arterial Transit & Northern Suburban Impact

Economic Significance

Connects dense residential, commercial, and industrial townships along the BT Road arterial trunk road directly to Central Kolkata.

Traffic Impact

Expected to de-congest extreme vehicular traffic bottlenecks on BT Road (Barrackpore Trunk Road).

Employment Centres Served

Serves hundreds of thousands of daily suburban commuters, jute mill workers, defense personnel, and students in North 24 Parganas.

Intermodal Connectivity

Provides dual suburban rail interchanges at Baranagar Road and Barrackpore Railway Station, plus Blue Line metro access at Baranagar.

Impact on Real Estate

Catalyzing high-rise residential apartment and retail commercial expansion across Kamarhati, Sodepur, Khardaha, and Barrackpore.

Geospatial Explorer

Kolkata Metro Line 5 (Pink Line) Alignment Map & GIS Explorer

Corridor Type Breakdown12.50 km Elevated Viaduct along BT Road (11 Stations)
Viaduct Length12.50 km Elevated Viaduct
Tunnel LengthN/A (Micro-tunneling for 60-inch water pipeline diversion)
River CrossingsKamarhati & Khardaha Canal Viaduct Overpasses
Major Bridges / CrossingsBT Road Overpass Central Pier Structure
Primary DepotBaranagar Depot / Noapara Main Depot

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Answers

Frequently Asked Questions

Kolkata Metro Pink Line is Line 5 of the Kolkata Metro, planned to connect Baranagar with Barrackpore along the Barrackpore Trunk Road. The sanctioned corridor is about 12.5 km long and is planned as an elevated metro line.

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Maharashtra Dashboard →MH
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement