Verified PartnerIndore Metro Yellow Line (Line 3): Route Map, Stations, Timings & Fare
Indore Metro Line 3 (Yellow Line) is the Phase 1 circular ring corridor of the Indore Metro project. The corridor is being developed by Madhya Pradesh Metro Rail Corporation Limited (MPMRCL). The first 5.9 km Super Priority Corridor opened in 2025, and Phase-I Reach-II, approximately 11 km with 11 stations, from Super Corridor-3 to Malviya Nagar Chauraha, was inaugurated on 5 September 2026 and passenger services commenced on 6 September 2026. The current operational network is approximately 17 km with 16 stations. The remaining sections of the Yellow Line are under construction.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Indore Metro Line 3 (Yellow Line) Economics
Expected Completion Date
Indore Metro Line 3 (Yellow Line) Stations
| # | Station | Type | Interchange / Connection | Opened |
|---|---|---|---|---|
| 01 | Devi Ahilya Bai Holkar Terminal | Elevated | Gandhi Nagar / Depot Gateway | Operational (31 May 2025) |
| 02 | Maharani Lakshmi Bai | Elevated | Super Corridor 6 (TCS / NMIMS Campus) | Operational (31 May 2025) |
| 03 | Rani Avanti Bai Lodhi | Elevated | Super Corridor 5 (Infosys SEZ Campus) | Operational (31 May 2025) |
| 04 | Rani Durgavati | Elevated | Super Corridor 4 (Bada Bangarda Access) | Operational (31 May 2025) |
| 05 | Veerangana Jhalkari Bai | Elevated | Super Corridor 3 (Saffron City Extension) | Operational (31 May 2025) |
| 06 | Super Corridor 2 | Elevated | Moni Baba Ashram Area | Operational (6 September 2026) |
| 07 | Super Corridor 1 | Elevated | Northern Super Corridor Reach | Operational (6 September 2026) |
| 08 | Bhawarsala Square | Elevated | MR 10 Ujjain Road Junction | Operational (6 September 2026) |
| 09 | MR 10 Road | Elevated | TGI Gran Nirvanaa Area | Operational (6 September 2026) |
| 10 | ISBT / MR10 Flyover | Elevated | Inter-State Bus Terminal (ISBT) | Operational (6 September 2026) |
| 11 | Chandragupta Square | Elevated | MR 10 East Sector | Operational (6 September 2026) |
| 12 | Hira Nagar | Elevated | Hira Nagar Police Station Link | Operational (6 September 2026) |
| 13 | Bapat Square | Elevated | Sukhliya Road Junction | Operational (6 September 2026) |
| 14 | Meghdoot Garden | Elevated | Meghdoot Garden Park Reach | Operational (6 September 2026) |
| 15 | Vijay Nagar Square | Elevated | Vijay Nagar Commercial Hub | Operational (6 September 2026) |
| 16 | Malviya Nagar Chauraha | Elevated | AB Road & Ring Road Junction (Radisson Square location) | Operational (6 September 2026) |
| 17 | Mumtaj Bag Colony | Elevated | Shaheed Bagh Area | Under Construction |
| 18 | Khajrana Square | Elevated | Khajrana Ganesh Mandir Gateway | Under Construction |
| 19 | Bengali Square | Elevated | Eastern Ring Road Junction | Under Construction |
| 20 | Patrakar Colony | Elevated | Kanadia Road Link | Under Construction |
| 21 | Palasia Square | Elevated | Old Palasia Commercial Hub | Under Construction |
| 22 | High Court | Elevated | MP High Court Indore Bench | Under Construction |
| 23 | Indore Junction Railway Station | Underground | Planned underground interchange with Indian Railways | Under Construction |
| 24 | Rajwada | Underground | Planned underground interchange at historic Rajwada Palace | Under Construction |
| 25 | Chota Ganpati | Underground | Malharganj Cultural Area | Under Construction |
| 26 | Bada Ganpati | Underground | Bada Ganpati Square | Under Construction |
| 27 | Ramchandra Nagar Square | Underground | Airport Road Junction | Under Construction |
| 28 | BSF / Kalani Nagar | Underground | BSF Headquarters & Kalani Nagar | Under Construction |
| 29 | Devi Ahilya Bai Holkar Airport | Underground | Planned Indore Airport Terminal Station | Under Construction |
Indore Metro Line 3 (Yellow Line) Route Map
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerIndore Metro Line 3 (Yellow Line) Technical Specifications
| Parameter | Value |
|---|---|
| Estimated Cost | Original Approved Cost: ₹7,500.80 Cr | Revised Project Cost: ₹12,889.38 Cr |
| Corridor Type | Rapid Transit Metro (Elevated & Underground Ring) |
| Primary Depot | Gandhi Nagar Maintenance Depot |
| Track Gauge | Standard Gauge (1435 mm) |
| Technical Speed | Maximum Design Speed: 90 km/h | Operating Speed: 80 km/h |
| Total Length | 33.53 km |
| Opened / Est. Opening | Super Priority Corridor (5.9 km) opened in 2025 | Phase-I Reach-II (~11 km, 11 stations) inaugurated: 5 September 2026 (Passenger operations from 6 September 2026) | Full corridor target: December 2028 |
| Corridor Status | Partially Operational |
| Operator | Madhya Pradesh Metro Rail Corporation Limited (MPMRCL) |
| Stations Count | 29 Stations in Phase 1 (22 Elevated, 7 Underground) |
| Line Number | Line 3 (Yellow Line) |
| Rolling Stock | Alstom 3-car Metropolis trainsets |
| targetOpening | Phased 2025–2028 |
| Electrification System | 750V DC Third Rail |
| Government Monitoring Target | December 2028 (MoSPI Monitored Target) |
| operationalSection | Devi Ahilya Bai Holkar Terminal → Malviya Nagar Chauraha (~17 km / 16 Stations) |
Indore Metro Line 3 (Yellow Line) Timeline
Cabinet approved Phase 1 of Indore Metro Rail Project (Original Approved Cost: ₹7,500.80 Cr) covering 31.55 km, 30 stations
Civil construction commenced for Super Corridor elevated viaduct
Trial runs flagged off on 5.9 km Super Priority Corridor
Super Priority Corridor inaugurated on 31 May 2025; passenger operations commenced on the initial 5.9 km, 5-station section in 2025.
Phase-I Reach-II / Priority Corridor-2 inaugurated, adding approximately 11 km and 11 stations from Super Corridor-3 to Malviya Nagar Chauraha.
Passenger operations commenced on the newly inaugurated extension.
Government/MoSPI monitored target completion for full 33.53 km 29-station Yellow Line circular ring corridor.
Indore Metro Line 3 (Yellow Line) Economic & Connectivity Impact
Economic Significance
Connects major economic growth engines of Indore including the Super Corridor IT SEZ, Vijay Nagar commercial center, and industrial zones.
Traffic Impact
Provides crucial high-capacity bypass around congested arterial corridors like AB Road, Ring Road, and central Rajwada markets.
Employment Centres Served
Enables reliable daily commuting for thousands of IT professionals, students, and healthcare workers traveling to TCS, Infosys, Devi Ahilya University, and major institutions.
Intermodal Connectivity
Operational connectivity now includes the MR 10 / ISBT area and Vijay Nagar commercial hub, while planned extensions will provide connectivity toward Indore Junction Railway Station, Rajwada and Devi Ahilya Bai Holkar International Airport.
Impact on Real Estate
Catalyzes transit-oriented commercial and residential real estate along Super Corridor, MR 10, and Eastern Ring Road.
Indore Metro Line 3 (Yellow Line) Alignment Map & GIS Explorer
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerFrequently Asked Questions
Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.