The Bhopal Metro Orange Line route (Line 2: Karond Chauraha – AIIMS) is a 14.99 km rapid transit corridor serving Bhopal, Madhya Pradesh. Commuters tracking Bhoj Metro Orange Line updates can access the official 16 station sequence across 13.2 km elevated and 1.79 km underground twin-tunnel sections. The 1.79 km underground section contains 2 underground stations (Nadra Bus Stand and Bhopal Railway Station), while the remaining 14 stations (including Aishbagh and Pul Bogda) are elevated. The 6.22 km priority section from Subhash Nagar to AIIMS (8 built elevated stations) is commercially operational following passenger inauguration on 20 December 2025, with 2026 reporting confirming two-way operations. Civil construction and tunneling actively progress on the balance 8.77 km section extending to Karond Chauraha under MPMRCL execution.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Bhopal Metro Orange Line Economics
Expected Completion Date
Bhopal Metro Orange Line Stations & Interchanges
| # | Station | Type | Interchange / Connection | Opened |
|---|---|---|---|---|
| 01 | Karond Chauraha | Terminal | Karond Square & Outer Ring Road Link | Under Construction |
| 02 | Krishi Upaj Mandi | Regular | Agricultural Market Precinct | Under Construction |
| 03 | DIG Bungalow | Regular | DIG Bungalow Square | Under Construction |
| 04 | Sindhi Colony | Regular | Sindhi Colony Commercial Market | Under Construction |
| 05 | Nadra Bus Stand | Interchange | Nadra Intercity Bus Stand | Under Construction |
| 06 | Bhopal Railway Station | Interchange | Bhopal Central Railway Station (IR) | Under Construction |
| 07 | Aishbagh | Regular | Aishbagh Commercial Zone | Under Construction |
| 08 | Pul Bogda | Interchange | Blue Line (Line 5 Interchange) | Under Construction |
| 09 | Subhash Nagar | Regular | Subhash Nagar Depot Link | Commercially Operational |
| 10 | Kendriya Vidyalaya | Regular | KV School Campus Precinct | Commercially Operational |
| 11 | Board Office Chauraha | Regular | Board Office Square & DB City Mall | Commercially Operational |
| 12 | MP Nagar | Regular | Maharana Pratap Nagar Commercial Hub | Commercially Operational |
| 13 | Rani Kamalapati Railway Station | Interchange | Rani Kamalapati Railway Station (IR) | Commercially Operational |
| 14 | DRM Office | Regular | Divisional Railway Manager Office Precinct | Commercially Operational |
| 15 | Alkapuri | Regular | Alkapuri Residential Sector | Commercially Operational |
| 16 | AIIMS | Terminal | All India Institute of Medical Sciences (AIIMS) | Commercially Operational |
Bhopal Metro Orange Line Route Map
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerBhopal Metro Orange Line Technical Specifications
| Parameter | Value |
|---|---|
| Corridor Type | Elevated (13.2 km) & Underground (1.79 km Twin Tunnel) |
| Primary Depot | Subhash Nagar Maintenance Depot |
| Track Gauge | Standard Gauge (1435 mm) |
| Total Length | 14.99 km |
| Opened / Est. Opening | 20 December 2025 (Priority Commercial Operations) | Target Phase 1 completion: 2027 |
| Corridor Status | Partially Operational |
| Maximum Design Speed | 80 km/h |
| Operator | Madhya Pradesh Metro Rail Corporation Limited (MPMRCL - 50:50 GoI/GoMP JV) |
| Stations Count | 16 Approved (14 Elevated + 2 Underground: 8 Built & Operational + 8 Under Construction) |
| Line Number | Phase 1 Line 2 (Orange Line) |
| Electrification System | 750V DC Third Rail |
Bhopal Metro Orange Line Timeline
Union Cabinet approves Bhopal Metro Phase 1 (₹6,941.40 Cr completion cost); 6.225 km priority civil package (BH-01) awarded in November 2018.
First 3-car Alstom metro trainset delivered to Subhash Nagar depot in August 2023; priority corridor trial runs conducted in October 2023.
Commercial passenger operations officially inaugurated on 20 December 2025 for the Subhash Nagar to AIIMS priority section.
2026 reporting confirms two-way commercial operations on priority corridor; tunneling and pier casting active on Karond extension.
Bhopal Metro Orange Line Economic & Connectivity Impact
Economic Significance
Connects major economic centers of Bhopal including MP Nagar commercial hub, Board Office Chauraha, Rani Kamalapati Railway Station, and AIIMS healthcare complex.
Traffic Impact
Relieves traffic bottlenecks along Hoshangabad Road and central arterial roads connecting Old Bhopal with New Bhopal.
Employment Centres Served
Provides rapid transit for thousands of medical professionals, students, railway commuters, and office workers daily.
Intermodal Connectivity
Features crucial interchanges with Blue Line at Pul Bogda and Indian Railways at Bhopal Railway Station and Rani Kamalapati Railway Station.
Bhopal Metro Orange Line Alignment Map & GIS Explorer
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerFrequently Asked Questions
Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.