Indore Metro Line 1 is a proposed north-south arterial radial corridor planned under the MPMRCL Master Plan. Originating at Sri Aurobindo Hospital in northern Indore, the line runs along Sanwer Road and central Indore through Collectorate Office, where it bifurcates into two branches: Line 1A (terminating at Indore Bypass 1 across 18 stations, ~20.2 km) and Line 1B (terminating at Regional Park via Choithram across 13 stations, ~15.5 km). The corridor is designed to provide high-speed transit linking industrial areas, hospitals, educational campuses, and southern residential zones.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Indore Metro Line 1 (Lines 1A & 1B) Economics
Expected Completion Date
Indore Metro Line 1 (Lines 1A & 1B) Stations
| # | Station | Type | Interchange / Connection | Opened |
|---|---|---|---|---|
| 01 | Sri Aurobindo Hospital | Elevated | Northern Terminal / Healthcare Hub | Proposed (Line 1A & 1B) |
| 02 | Bhawarsala Square | Elevated | Interchange with Line 3 Yellow Line | Proposed (Line 1A & 1B) |
| 03 | Sanwer Industrial Area | Elevated | Sanwer Road Industrial Belt | Proposed (Line 1A & 1B) |
| 04 | Ganesh Sham Colony | Elevated | Residential Sector | Proposed (Line 1A & 1B) |
| 05 | Banganga | Elevated | Banganga Chauraha | Proposed (Line 1A & 1B) |
| 06 | Laxmibai Nagar Square | Elevated | Laxmibai Nagar Railway Station Access | Proposed (Line 1A & 1B) |
| 07 | Mara Mata Square | Elevated | Old City Arterial | Proposed (Line 1A & 1B) |
| 08 | Imli Bazar Chowk | Underground | Central Commercial Core | Proposed (Line 1A & 1B) |
| 09 | Rajwada Palace | Underground | Interchange with Line 3 Yellow Line | Proposed (Line 1A & 1B) |
| 10 | Collectorate Office | Underground | Central Administrative Hub (Bifurcation Point) | Proposed (Line 1A & 1B) |
| 11 | Central Excise | Elevated | Line 1B Branch Reach | Proposed (Line 1B) |
| 12 | Choithram | Elevated | Choithram Hospital & Research Centre | Proposed (Line 1B) |
| 13 | Regional Park | Elevated | Pipliyapala Regional Park Terminal | Proposed (Line 1B Terminal) |
| 14 | Indore Icchapur Rail Crossing | Elevated | Line 1A Branch Reach | Proposed (Line 1A) |
| 15 | Tower Square | Elevated | Tower Chauraha Arterial | Proposed (Line 1A) |
| 16 | Bhawarkuan Square | Elevated | Major Student & Educational Hub | Proposed (Line 1A) |
| 17 | Holkar University / IT Park | Elevated | DAVV University & Crystal IT Park | Proposed (Line 1A) |
| 18 | Rani Bagh | Elevated | Khandwa Road Residential Sector | Proposed (Line 1A) |
| 19 | Limbodi | Elevated | Southern Residential Reach | Proposed (Line 1A) |
| 20 | Ralamandal | Elevated | Ralamandal Sanctuary Road | Proposed (Line 1A) |
| 21 | Indore Bypass 1 | Elevated | Southern Ring Road / Bypass Terminal | Proposed (Line 1A Terminal) |
Indore Metro Line 1 (Lines 1A & 1B) Route Map
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerIndore Metro Line 1 (Lines 1A & 1B) Technical Specifications
| Parameter | Value |
|---|---|
| Estimated Cost | Proposed Master Plan Scope |
| Corridor Type | Proposed Radial Metro (Elevated & Underground) |
| Primary Depot | Proposed Secondary Depot |
| Track Gauge | Standard Gauge (1435 mm) |
| Technical Speed | Maximum Design Speed: 90 km/h | Operating Speed: 80 km/h |
| Total Length | ~20.2 km (Line 1A) / ~15.5 km (Line 1B) |
| Opened / Est. Opening | Proposed (Phase 2 Master Plan Scope) |
| Corridor Status | Proposed & Review Stages |
| Operator | Madhya Pradesh Metro Rail Corporation Limited (MPMRCL) |
| Stations Count | 18 Planned (Line 1A) / 13 Planned (Line 1B) |
| Line Number | Line 1 (Lines 1A & 1B) |
| Rolling Stock | Standard 3-car Metropolis trainsets |
| targetOpening | Post-Phase 1 Ring Completion |
| Electrification System | 750V DC Third Rail |
| Government Monitoring Target | Under DPR Planning |
Indore Metro Line 1 (Lines 1A & 1B) Timeline
Identified in the 124 km Comprehensive DPR prepared by Rohit Associates for MPMRCL.
Priority given to Line 3 (Yellow Line) 33.53 km Ring Corridor currently under execution.
Detailed engineering and sanctioning slated following Phase 1 ring commissioning.
Indore Metro Line 1 (Lines 1A & 1B) Economic & Connectivity Impact
Economic Significance
Connects major healthcare facilities like Sri Aurobindo Hospital, Crystal IT Park, educational institutions, and the Sanwer Road industrial belt.
Traffic Impact
Relieves extreme north-south vehicular congestion along AB Road, Sanwer Road, and Khandwa Road.
Employment Centres Served
Serves daily commuters traveling between northern industrial zones and southern IT / academic clusters.
Intermodal Connectivity
Provides dual interchange with Line 3 Yellow Line at Bhawarsala and Rajwada.
Impact on Real Estate
Catalyzes transit-oriented mixed-use development along Khandwa Road and the southern Bypass corridor.
Indore Metro Line 1 (Lines 1A & 1B) Alignment Map & GIS Explorer
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerFrequently Asked Questions
Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.