Advertisement // Sponsor

Verified Partner
Loading sponsor...
METRO CORRIDOR DOSSIER // INDORE-METRO-LINE-1

Indore Metro Line 1 (Lines 1A & 1B): Route Map, Stations, DPR & Status

Proposed & Review Stages📏 ~20.2 km (Line 1A) / ~15.5 km (Line 1B)🚉 18 Planned (Line 1A) / 13 Planned (Line 1B) Stations🗓 Proposed🏢 Madhya Pradesh Metro Rail Corporation Limited (MPMRCL)

Indore Metro Line 1 is a proposed north-south arterial radial corridor planned under the MPMRCL Master Plan. Originating at Sri Aurobindo Hospital in northern Indore, the line runs along Sanwer Road and central Indore through Collectorate Office, where it bifurcates into two branches: Line 1A (terminating at Indore Bypass 1 across 18 stations, ~20.2 km) and Line 1B (terminating at Regional Park via Choithram across 13 stations, ~15.5 km). The corridor is designed to provide high-speed transit linking industrial areas, hospitals, educational campuses, and southern residential zones.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Indore Metro Line 1 (Lines 1A & 1B) Economics

Indore Metro Line 1 (Lines 1A & 1B) Economics

Total InvestmentProposed Master Plan Scope
Primary Backers50:50 Joint Venture of Government of India & Government of Madhya Pradesh (Proposed)
Operator / ModelState SPV (MPMRCL)
Target Opening

Expected Completion Date

StatusProposed & Review Stages
Target Opening DateUnder DPR Planning
Station list

Indore Metro Line 1 (Lines 1A & 1B) Stations

#StationTypeInterchange / ConnectionOpened
01
Sri Aurobindo Hospital
ElevatedNorthern Terminal / Healthcare HubProposed (Line 1A & 1B)
02
Bhawarsala Square
ElevatedInterchange with Line 3 Yellow LineProposed (Line 1A & 1B)
03
Sanwer Industrial Area
ElevatedSanwer Road Industrial BeltProposed (Line 1A & 1B)
04
Ganesh Sham Colony
ElevatedResidential SectorProposed (Line 1A & 1B)
05
Banganga
ElevatedBanganga ChaurahaProposed (Line 1A & 1B)
06
Laxmibai Nagar Square
ElevatedLaxmibai Nagar Railway Station AccessProposed (Line 1A & 1B)
07
Mara Mata Square
ElevatedOld City ArterialProposed (Line 1A & 1B)
08
Imli Bazar Chowk
UndergroundCentral Commercial CoreProposed (Line 1A & 1B)
09
Rajwada Palace
UndergroundInterchange with Line 3 Yellow LineProposed (Line 1A & 1B)
10
Collectorate Office
UndergroundCentral Administrative Hub (Bifurcation Point)Proposed (Line 1A & 1B)
11
Central Excise
ElevatedLine 1B Branch ReachProposed (Line 1B)
12
Choithram
ElevatedChoithram Hospital & Research CentreProposed (Line 1B)
13
Regional Park
ElevatedPipliyapala Regional Park TerminalProposed (Line 1B Terminal)
14
Indore Icchapur Rail Crossing
ElevatedLine 1A Branch ReachProposed (Line 1A)
15
Tower Square
ElevatedTower Chauraha ArterialProposed (Line 1A)
16
Bhawarkuan Square
ElevatedMajor Student & Educational HubProposed (Line 1A)
17
Holkar University / IT Park
ElevatedDAVV University & Crystal IT ParkProposed (Line 1A)
18
Rani Bagh
ElevatedKhandwa Road Residential SectorProposed (Line 1A)
19
Limbodi
ElevatedSouthern Residential ReachProposed (Line 1A)
20
Ralamandal
ElevatedRalamandal Sanctuary RoadProposed (Line 1A)
21
Indore Bypass 1
ElevatedSouthern Ring Road / Bypass TerminalProposed (Line 1A Terminal)
Geospatial Alignment

Indore Metro Line 1 (Lines 1A & 1B) Route Map

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Specs sheet

Indore Metro Line 1 (Lines 1A & 1B) Technical Specifications

ParameterValue
Estimated CostProposed Master Plan Scope
Corridor TypeProposed Radial Metro (Elevated & Underground)
Primary DepotProposed Secondary Depot
Track GaugeStandard Gauge (1435 mm)
Technical SpeedMaximum Design Speed: 90 km/h | Operating Speed: 80 km/h
Total Length~20.2 km (Line 1A) / ~15.5 km (Line 1B)
Opened / Est. OpeningProposed (Phase 2 Master Plan Scope)
Corridor StatusProposed & Review Stages
OperatorMadhya Pradesh Metro Rail Corporation Limited (MPMRCL)
Stations Count18 Planned (Line 1A) / 13 Planned (Line 1B)
Line NumberLine 1 (Lines 1A & 1B)
Rolling StockStandard 3-car Metropolis trainsets
targetOpeningPost-Phase 1 Ring Completion
Electrification System750V DC Third Rail
Government Monitoring TargetUnder DPR Planning
Chronological Milestones

Indore Metro Line 1 (Lines 1A & 1B) Timeline

Master Plan

Identified in the 124 km Comprehensive DPR prepared by Rohit Associates for MPMRCL.

Phase 1 Focus

Priority given to Line 3 (Yellow Line) 33.53 km Ring Corridor currently under execution.

Future Phase

Detailed engineering and sanctioning slated following Phase 1 ring commissioning.

Proprietary analytics

Indore Metro Line 1 (Lines 1A & 1B) Economic & Connectivity Impact

Economic Significance

Connects major healthcare facilities like Sri Aurobindo Hospital, Crystal IT Park, educational institutions, and the Sanwer Road industrial belt.

Traffic Impact

Relieves extreme north-south vehicular congestion along AB Road, Sanwer Road, and Khandwa Road.

Employment Centres Served

Serves daily commuters traveling between northern industrial zones and southern IT / academic clusters.

Intermodal Connectivity

Provides dual interchange with Line 3 Yellow Line at Bhawarsala and Rajwada.

Impact on Real Estate

Catalyzes transit-oriented mixed-use development along Khandwa Road and the southern Bypass corridor.

Geospatial Explorer

Indore Metro Line 1 (Lines 1A & 1B) Alignment Map & GIS Explorer

Elevated / UndergroundProposed radial corridor featuring 18 stations on Line 1A and 13 stations on Line 1B.
Major Bridges / CrossingsRailway overbridges across Indian Railways lines at Laxmibai Nagar and Icchapur rail crossing.
Primary DepotProposed Depot

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Answers

Frequently Asked Questions

Indore Metro Line 1 is a proposed north-south arterial radial corridor planned under the MPMRCL Master Plan. It originates from Sri Aurobindo Hospital and branches at Collectorate Office into Line 1A (to Indore Bypass 1, 18 stations) and Line 1B (to Regional Park, 13 stations).

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Madhya Pradesh Dashboard →MP
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement