Advertisement // Sponsor
Verified PartnerMumbai–Nagpur Expressway (Samruddhi Mahamarg) Route Map, Toll Rates, Status & Latest Updates (2026)
The 701-kilometer Hindu Hrudaysamrat Balasaheb Thackeray Maharashtra Samruddhi Mahamarg is Maharashtra's flagship high-speed access-controlled expressway (ME-2), connecting Nagpur to Amane in Thane district across 10 districts. Executed by MSRDC at a sanctioned project cost of ₹55,335 Crore across 16 EPC packages, the full 701 km corridor is open to traffic following the commissioning of the final 76 km stretch from Igatpuri to Amane across Kasara Ghat.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Mumbai–Nagpur Expressway (Samruddhi Mahamarg) Route Map & Alignment
View and download the latest Mumbai–Nagpur Expressway (Samruddhi Mahamarg) route map showing the project alignment, major junctions, districts covered and connectivity corridors.
Advertisement // Sponsor
Verified Partner
Advertisement // Sponsor
Verified PartnerMumbai–Nagpur Expressway (Samruddhi Mahamarg)Cost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| State | Maharashtra |
| Authority | MSRDC |
| Speed Limit | 120 km/h (Flat Plain) / 100 km/h (Ghat & Tunnels) |
| Opening Date | 11 December 2022 (Phase 1) |
| Total Length | 701 km |
| Toll Category | Operational Tolled Super Expressway |
| States Covered | Maharashtra |
| Tolling System | Closed-Loop Distance FASTag Tolling |
| Completion Date | 2023-2025 |
| Districts Covered | 10 Districts (Nagpur, Wardha, Amravati, Washim, Buldhana, Jalna, Chhatrapati Sambhajinagar, Ahmednagar, Nashik, Thane) |
Mumbai–Nagpur Samruddhi Mahamarg Toll Plazas & Rates
The Hindu Hrudaysamrat Balasaheb Thackeray Maharashtra Samruddhi Mahamarg connects Nagpur to Mumbai over 701 km. The corridor uses a modern closed-loop distance-based FASTag tolling system across 24+ interchanges and toll plazas. Base toll rate for Light Motor Vehicles (Cars/Jeeps) is gazetted at ₹1.73 to ₹2.06 per km. The 625 km operational section between Nagpur and Igatpuri charges ₹1,212 for cars, with the full 701 km stretch to Amane / Thane capped at ₹1,444.
| No. | Toll Plaza Name | Plaza Code / Chainage | Interchange Details & Connectivity |
|---|---|---|---|
| 1 | Zero Point / Shivmadka Plaza (Nagpur) | Km 0 (Nagpur) | Eastern origin of Samruddhi Mahamarg handling Vidarbha regional traffic. |
| 2 | Seloo Interchange Plaza (Wardha) | Km 50 (Wardha) | Connects Wardha, Sevagram, and Hinganghat industrial area. |
| 3 | Nandgaon Khandeshwar Plaza (Amravati) | Km 110 (Amravati) | Serves Amravati textile park and cotton industrial belt. |
| 4 | Karanja Lad Plaza (Washim) | Km 165 (Washim) | Key junction connecting Washim, Akola, and Yavatmal. |
| 5 | Mehkar Plaza (Buldhana) | Km 245 (Buldhana) | Access point for Lonar Crater, Mehkar, and Khamgaon. |
| 6 | Jalna Interchange Plaza | Km 335 (Jalna) | Connects Jalna steel city and dry port hub into Marathwada. |
| 7 | Shendra / Sawangi Plaza (Chhatrapati Sambhajinagar) | Km 395 (Aurangabad) | Major junction for AURIC smart city, Waluj MIDC, and Ajanta-Ellora. |
| 8 | Kopargaon / Shirdi Interchange (Ahmednagar) | Km 480 (Ahmednagar) | High-density pilgrim interchange serving Shirdi Sai Baba Temple. |
| 9 | Sinnar Interchange Plaza (Nashik) | Km 550 (Nashik) | Connects Nashik industrial area, wine cluster, and Pune bypass. |
| 10 | Igatpuri Mainline Plaza (Ghat Section) | Km 625 (Nashik) | Kasara Ghat crossing portal leading into Mumbai Metropolitan Region. |
| 11 | Amane / Thane Terminal Plaza | Km 701 (Thane) | Western terminus connecting into JNPT corridor, Mumbai, and Thane. |
Calculate Exact Toll Rates & Journey Price
Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.
Advertisement // Sponsor
Verified PartnerLatest Developments
Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
The Hindu Hrudaysamrat Balasaheb Thackeray Maharashtra Samruddhi Mahamarg (designated as Maharashtra Expressway 2 / ME-2) is a 701 km, 6-lane access-controlled greenfield expressway connecting Shivmadka on the Nagpur Outer Ring Road with Amane (near Bhiwandi, Thane district) on the Mumbai–Nashik Highway. Developed by MSRDC at a sanctioned capital cost of ₹55,335 Crore, it passes through 10 key districts and 24 grade-separated interchanges.
Yes, the entire 701 km stretch of the Samruddhi Mahamarg is open to public vehicular traffic following the commissioning of the final 76 km stretch from Igatpuri to Amane through Kasara Ghat in June 2025. This followed earlier phased inaugurations: Phase 1 (520 km, Nagpur to Shirdi) in December 2022, Phase 2 (80 km, Shirdi to Bharvir) in May 2023, and Bharvir to Igatpuri (25 km) in March 2024.
The total length of the expressway is exactly 701 km. Designed for a maximum operating speed of 120 km/h on plain sections, it reduces driving time between Nagpur and Mumbai/Thane from 16–18 hours down to approximately 8 hours under normal traffic conditions.
The Samruddhi Mahamarg operates a 100% automated closed-loop distance-based FASTag toll system. Toll is charged per kilometre traveled between entry and exit interchanges. Under the notified Maharashtra PWD toll schedule (effective 2025–2028), the rate for Light Motor Vehicles (Cars/Jeeps) is ₹2.06 per km, yielding an indicative end-to-end car toll of ₹1,444 across 701 km (baseline rate: ₹1,212). The actual fee is automatically deducted at the exit plaza.
Yes, under the official Maharashtra Electric Vehicle Policy, 100% battery electric vehicles (EVs) are completely exempted from user toll charges on the Samruddhi Mahamarg and other state-notified corridors.
The sanctioned capital cost of the Mumbai–Nagpur Samruddhi Mahamarg is ₹55,335 Crore as per official MSRDC administrative sanction orders. This capital outlay financed civil construction across 16 EPC packages, land acquisition, automated traffic management systems (ATMS), 96 wildlife underpasses/overpasses, and wayside amenities.
The expressway directly traverses 10 districts: Nagpur, Wardha, Amravati, Washim, Buldhana, Jalna, Chhatrapati Sambhajinagar (Aurangabad), Ahilyanagar (Ahmednagar), Nashik, and Thane. It also provides fast access to 14 neighboring districts through 24 grade-separated interchanges.
The permissible speed limit is 120 km/h for passenger cars and light vehicles on plain terrain sections, and 80 km/h for heavy commercial trucks and buses. On hilly sections and the Kasara Ghat descent, the speed limit is regulated to 100 km/h, strictly enforced via automated speed radars and CCTV cameras.
Package 14 through Kasara Ghat includes Maharashtra's longest road tunnel—a 7.78 km twin-tube, 3-lane-per-tube tunnel constructed by Afcons Infrastructure using the New Austrian Tunnelling Method (NATM). The section also features an 84-meter-tall viaduct spanning deep mountain valleys and major bridges over the Vaitarna River.
The expressway features 24x7 Quick Response Vehicles (QRV), dedicated MSRDC highway patrol, and free emergency breakdown assistance. In case of medical or police emergencies, commuters can dial 108 (Ambulance), 112 (National Emergency), or the dedicated MSRDC Samruddhi helpline. Wayside amenity centers with fuel stations, EV charging, food courts, and clean washrooms are operational at regular intervals.
हिंदू हृदयसम्राट बालासाहेब ठाकरे महाराष्ट्र समृद्धि महामार्ग (महाराष्ट्र एक्सप्रेसवे 2 / ME-2) 701 किलोमीटर लंबा, 6-लेन का एक्सेस-कंट्रोल्ड ग्रीनफील्ड एक्सप्रेसवे है। यह नागपुर के शिवमडका (आउटर रिंग रोड) से शुरू होकर ठाणे जिले के आमने (भिवंडी के पास) तक जाता है, जहाँ यह मुंबई–नासिक हाईवे (NH-3) से जुड़ता है। MSRDC द्वारा ₹55,335 करोड़ की लागत से विकसित यह महामार्ग 10 प्रमुख जिलों और 24 ग्रेड-सेपरेटेड इंटरचेंज को आपस में जोड़ता है।
हाँ, जून 2025 में इगतपुरी से आमने (ठाणे) के बीच कसारा घाट वाले अंतिम 76 किमी हिस्से के शुरू होने के बाद पूरा 701 किलोमीटर लंबा समृद्धि महामार्ग जनता और वाहनों के लिए पूरी तरह खुल चुका है। इससे पहले चरण-1 (नागपुर से शिर्डी, 520 किमी) दिसंबर 2022 में, चरण-2 (शिर्डी से भरवीर, 80 किमी) मई 2023 में और भरवीर से इगतपुरी (25 किमी) मार्च 2024 में खोले गए थे।
समृद्धि महामार्ग की कुल लंबाई 701 किलोमीटर है। 120 किमी/घंटे की डिजाइन स्पीड के साथ इस एक्सप्रेसवे से नागपुर और मुंबई/ठाणे के बीच सड़क यात्रा का समय पहले के 16–18 घंटे से घटकर केवल 8 घंटे रह गया है।
समृद्धि महामार्ग पर 100% ऑटोमेटेड क्लोज्ड-लूप दूरी-आधारित FASTag टोल प्रणाली लागू है। यहाँ टोल केवल यात्रा की गई वास्तविक दूरी के अनुसार एक्जिट प्लाजा पर काटा जाता है। महाराष्ट्र पीडब्ल्यूडी की अधिसूचित दर (2025–2028) के अनुसार कारों/जीपों के लिए टोल दर ₹2.06 प्रति किलोमीटर है। 701 किमी के पूरे सफर के लिए कार का टोल लगभग ₹1,444 (बेस दर ₹1,212) है। आप जिस इंटरचेंज से चढ़ते और उतरते हैं, उसी हिसाब से सटीक टोल कटता है।
हाँ, महाराष्ट्र सरकार की आधिकारिक इलेक्ट्रिक वाहन नीति (Maharashtra EV Policy) के तहत समृद्धि महामार्ग पर 100% बैटरी चालित निजी और वाणिज्यिक इलेक्ट्रिक वाहनों (EVs) को टोल टैक्स से पूरी छूट प्राप्त है।
MSRDC के आधिकारिक प्रशासनिक आदेशों के अनुसार मुंबई–नागपुर समृद्धि महामार्ग की कुल स्वीकृत परियोजना लागत लगभग ₹55,335 करोड़ है। इस बजट में 16 ईपीसी पैकेजों का सिविल निर्माण, भूमि अधिग्रहण, ऑटोमेटेड ट्रैफिक मैनेजमेंट सिस्टम (ATMS), 96 वन्यजीव सुरक्षा संरचनाएं और यात्री सुविधाएं शामिल हैं।
यह एक्सप्रेसवे सीधे तौर पर महाराष्ट्र के 10 जिलों से होकर गुजरता है: नागपुर, वर्धा, अमरावती, वाशिम, बुलढाणा, जालना, छत्रपति संभाजीनगर (औरंगाबाद), अहिल्यानगर (अहमदनगर), नाशिक और ठाणे। इसके अलावा 24 इंटरचेंज के जरिए 14 अन्य पड़ोसी जिलों को भी सीधा संपर्क मिलता है।
समतल मैदानी हिस्सों में कारों और हल्के वाहनों के लिए अधिकतम गति सीमा 120 किमी/घंटा और भारी ट्रकों व बसों के लिए 80 किमी/घंटा तय है। पहाड़ी और कसारा घाट के ढलान वाले हिस्सों पर सुरक्षा के लिहाज से गति सीमा 100 किमी/घंटा निर्धारित की गई है, जिसकी निगरानी ऑटोमेटेड स्पीड रडार और कैमरों द्वारा की जाती है।
पैकेज 14 के तहत कसारा घाट में महाराष्ट्र की सबसे लंबी ट्विन-ट्यूब सड़क सुरंग बनाई गई है, जिसकी लंबाई 7.78 किलोमीटर और चौड़ाई 17.61 मीटर प्रति ट्यूब (3 लेन प्रत्येक) है। एफकॉन्स द्वारा न्यू ऑस्ट्रियन टनलिंग मेथड (NATM) से निर्मित इस सुरंग के साथ 84 मीटर ऊंचा वियाडक्ट और वैतरणा नदी पर पुल भी शामिल हैं, जिससे पुराना खतरनाक कसारा घाट बायपास हो जाता है।
समृद्धि महामार्ग पर 24 घंटे क्विक रिस्पांस व्हीकल्स (QRV) और पेट्रोलिंग वैन तैनात रहती हैं। किसी भी दुर्घटना या मेडिकल इमरजेंसी में यात्री 108 (एम्बुलेंस), 112 (राष्ट्रीय आपातकालीन नंबर) या MSRDC के समर्पित हेल्पलाइन पर कॉल कर सकते हैं। महामार्ग पर नियमित अंतराल पर पेट्रोल पंप, ईवी चार्जिंग स्टेशन, फूड कोर्ट और स्वच्छ शौचालय जैसी सुविधाएं उपलब्ध हैं।
Related Infrastructure Projects
Samruddhi Vadhvan Expressway
A proposed 104 km greenfield expressway connecting the Samruddhi Mahamarg with the upcoming Vadhvan Mega Port in Palghar, Maharashtra.
View Project →Nagpur-Chandrapur Expressway
A proposed 204 km four-lane access-controlled super communication highway connecting Nagpur and Chandrapur in eastern Maharashtra.
View Project →Nagpur Gondia Expressway
A proposed 162.6 km access-controlled greenfield expressway connecting Nagpur with Gondia via Bhandara in eastern Maharashtra.
View Project →Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.
