Advertisement // Sponsor
Verified PartnerElectronic City Elevated Expressway (Bengaluru) Route Map, Toll Rates & Exit Guide (2026)
The Electronic City Elevated Expressway (also known as the Hosur Road Elevated Expressway) is a fully operational, premium 9.98 km access-controlled elevated corridor developed by Bengaluru Elevated Tollway Private Limited (BETL).
The Electronic City Elevated Expressway Route connects South Bangalore to the key IT cluster. Commuting from Silk Board to Electronic City Elevated Expressway takes only 10 minutes compared to 45 minutes at grade. To bypass regular congestion, Electronic City Elevated Expressway Traffic conditions are monitored live at major entry/exit ramps.
The Electronic City Elevated Expressway is a fully operational 9.98 km elevated tollway corridor connecting Central Silk Board to Electronic City in Bengaluru. Developed by Bengaluru Elevated Tollway Pvt Ltd (BETL) under NHAI, it bypasses congested stretches of Hosur Road (NH-44).
ಎಲೆಕ್ಟ್ರಾನಿಕ್ ಸಿಟಿ ಎಲಿವೇಟೆಡ್ ಎಕ್ಸ್ಪ್ರೆಸ್ವೇ (Electronic City Elevated Expressway)
ಬೆಂಗಳೂರಿನ ಸಿಲ್ಕ್ ಬೋರ್ಡ್ ಜಂಕ್ಷನ್ನಿಂದ ಎಲೆಕ್ಟ್ರಾನಿಕ್ ಸಿಟಿಯವರೆಗೆ 9.98 ಕಿಮೀ ಉದ್ದದ ಎಲಿವೇಟೆಡ್ ಟೋಲ್ವೇ ಕಾರಿಡಾರ್ ಆಗಿದೆ.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Electronic City Elevated Expressway Route Map & Alignment
Track the Electronic City Elevated Expressway (Bengaluru Elevated Tollway) route map, latest toll rates, live traffic status, FASTag info, and entry/exit ramps.
Advertisement // Sponsor
Verified Partner
Advertisement // Sponsor
Verified PartnerElectronic City Elevated ExpresswayCost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| Project Name | Electronic City Elevated Expressway (Bengaluru Elevated Tollway) |
| Total Length | 9.98 km |
| Current Status | Fully Operational |
| Estimated Cost | Approximately ₹775 Crore |
| Development Model | BOT Concession by BETPL (expired 10 September 2026); currently operated by NHAI |
| Target Completion | Opened on 22 January 2010 |
| Corridor End Point | Electronic City Phase I & II (Hosur Road / NH-44) |
| Lane Configuration | 4-Lane Elevated Viaduct + 6-Lane At-Grade Highway (NH-44) |
| Corridor Start Point | Central Silk Board Junction (South Bengaluru) |
| Official Project Name | Electronic City Elevated Expressway (Bengaluru Elevated Tollway / BETL) |
| Total Corridor Length | 9.98 km (4-Lane Elevated Expressway over 6-Lane NH-44) |
| Current Project Status | Fully Operational |
| Implementing Authority | National Highways Authority of India (NHAI) · Formerly BETPL |
| Inauguration / Opening Date | 22 January 2010 |
Electronic City Elevated Expressway (NH-44) Toll Rates & Concession Status (2026)
The Electronic City Elevated Expressway is an operational 9.98 km elevated 4-lane highway on NH-44 (formerly NH-7) running from Central Silk Board Junction to Electronic City in South Bengaluru. Toll collection is managed via the dedicated elevated section toll plaza at Km 18.000.
Important Distinction & Post-Concession Status Update (September–November 2026): The elevated corridor operates with one single toll plaza (Elevated Section / Electronic City Toll Plaza, Plaza Code: 35001 at Km 18.000). Attibele Toll Plaza is a separate toll point further south on the Bengaluru–Hosur NH-44 corridor near the Karnataka–Tamil Nadu border and is not a plaza on the elevated flyover. Concession Concluded: The 15-year Build-Operate-Transfer (BOT) concession agreement of Bangalore Elevated Tollway Pvt. Ltd. (BETPL) officially ended on 10 September 2026, and NHAI took over the corridor. NHAI's Bengaluru regional office stated that toll collection continues under the existing statutory Gazette notification until required statutory procedures, including a potential new Gazette notification, are completed. Two-wheeler exemption has been actively discussed but remains pending an official notification.
| No. | Toll Plaza Name | Plaza Code / Chainage | Interchange Details & Connectivity |
|---|---|---|---|
| 1 | Elevated Section / Electronic City Toll Plaza | 35001 | Highway: NH-44 (formerly NH-7) at Km 18.000. Tollable Length: ~9.994 km (Silk Board Junction to Electronic City). Concessionaire before expiry: BETPL. Current Authority: NHAI (taken over 10 September 2026). |
Calculate Exact Toll Rates & Journey Price
Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.
Published baseline tariff effective 1 July 2026. Operator BETPL's concession period ended on 10 September 2026. Corridor and plaza operations transitioned to NHAI. Toll collection continues under existing statutory notification pending official post-concession Gazette notification. Sources: Indian Express, Moneycontrol, NHAI circulars, NPCI Plaza Master (Code: 35001).
Key Junctions & Ramps Along Electronic City Elevated Expressway
The 9.98 km elevated viaduct spans major commercial and residential intersections along Hosur Road (NH-44).
Primary entry/exit ramp connecting Outer Ring Road (ORR) and Madiwala to the elevated flyover.
High-pier viaduct bypassing dense urban signals at Bommanahalli, Kudlu Gate, Singasandra, and Hosa Road.
Dedicated exit loops into Electronic City IT campus, BETL Toll Plaza, and NICE Peripheral Ring Road.
Electronic City Elevated Expressway Route & Ramps Overview
The Electronic City Elevated Expressway (officially the Bengaluru Elevated Tollway, operated by BETL under NHAI) is a 9.98 km four-lane access-controlled elevated highway built directly above the six-lane Hosur Road (NH-44) in South Bengaluru. Running from Central Silk Board Junction to Electronic City, it is one of India's longest urban elevated highway flyovers, serving Bengaluru's largest IT and electronics hub.
Silk Board to Electronic City Travel Time Reduction
The elevated expressway reduces commute time between Central Silk Board Junction and Electronic City from 45–60 minutes on the signalized at-grade Hosur Road to just 10–12 minutes.
Electronic City Flyover Toll, FASTag & NICE Road Connectivity
Constructed above NH-44 under a Build-Operate-Transfer (BOT) concession, the Electronic City Elevated Expressway integrates directly with the NICE Peripheral Road interchange at Electronic City and is fully equipped with automated FASTag tolling lanes for cars, two-wheelers, buses, and commercial vehicles.
- 9.98 km 4-lane elevated viaduct bypassing 10+ major traffic signals on Hosur Road (NH-44)
- Direct ramp integration with Electronic City Phase I, Phase II, and NICE Road
- FASTag-enabled BETL toll plaza at the Electronic City end
- Complements Namma Metro Yellow Line (RV Road – Bommasandra) along the Hosur Road IT corridor
Advertisement // Sponsor
Verified PartnerLatest Developments
Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
The Electronic City Elevated Expressway is a nearly 10 km elevated highway on NH-44 (formerly NH-7) in Bengaluru. It connects Central Silk Board Junction with Electronic City along the Hosur Road corridor and provides an elevated alternative to the signal-heavy road below.
The Electronic City Elevated Expressway project was developed as a BOT (Toll) highway project to improve traffic movement between Central Silk Board and Electronic City. The elevated section was built by Bangalore Elevated Tollway Private Limited (BETPL) and was opened to traffic in January 2010.
The Electronic City Elevated Expressway route runs along NH-44/Hosur Road from the Central Silk Board Junction area to Electronic City. The NHAI toll record identifies the tollable elevated section as the Silk Board Junction–Electronic City stretch, with a tollable length of 9.994 km.
The elevated expressway starts at the Central Silk Board Junction area and ends at Electronic City in Bengaluru. It forms part of the Bengaluru–Hosur highway corridor, with the road continuing south from Electronic City toward Attibele and the Karnataka–Tamil Nadu border.
The Electronic City Elevated Expressway map shows the approximately 10 km elevated corridor running along Hosur Road between Central Silk Board and Electronic City. It is separate from the ground-level carriageways and connects directly into the wider NH-44 Bengaluru–Hosur corridor.
The Electronic City Elevated Expressway is approximately 10 km long. NHAI's toll information records the tollable length of the elevated Silk Board Junction–Electronic City section as 9.994 km.
The alignment follows the NH-44/Hosur Road corridor between Central Silk Board Junction and Electronic City. The elevated structure was built above the existing road corridor so that through traffic can bypass many of the ground-level junctions and signals along this busy Bengaluru–Hosur route.
NHAI's toll information records a capital cost of ₹974.70 crore for the elevated Electronic City section. Contemporary project reporting commonly places the project cost at around ₹1,000 crore, so these figures should not be treated as separate projects.
The Electronic City Elevated Expressway was developed under a BOT (Toll) arrangement by Bangalore Elevated Tollway Private Limited (BETPL), a special-purpose company formed for the project. NHAI's toll records identify Bangalore Elevated Tollway Private Limited as the concessionaire/OMT contractor.
Construction of the Electronic City Elevated Expressway began in the mid-2000s under the BOT concession. The elevated road was completed and opened to traffic in January 2010, after which it became an important high-capacity connection between Silk Board and Electronic City.
The Electronic City Elevated Expressway is an operational road. However, its concession arrangement changed in September 2026: the original concession agreement expired on 10 September 2026. NHAI and the Union government have been deciding how toll collection, operation and maintenance should be handled after the concession expiry.
The tariff applicable before the concession expiry included ₹65 for a single journey by a car, jeep or van, ₹100 for a multiple-journey ticket and ₹1,960 for a monthly pass. Two-wheelers were charged ₹25 for a single journey and ₹40 for multiple journeys. These rates were introduced from 1 July 2026. After the BETPL concession expired on 10 September 2026, the future toll-collection arrangement became subject to NHAI and government decisions, so the ₹65 rate should not be presented as a permanently fixed future tariff.
The BETPL concession ended on 10 September 2026, but toll collection did not simply cease with the expiry. Recent reports indicate that NHAI has continued collecting the existing toll while the post-concession operation and maintenance arrangement is being worked out. Therefore, the post-10 September 2026 toll should be described as subject to the new NHAI-operated arrangement rather than as the former BETPL concession continuing unchanged.
The major latest development is the expiry of the original BETPL concession on 10 September 2026. The Union Ministry of Road Transport and Highways and NHAI have been considering the future arrangement for toll collection and maintenance of the approximately 10 km elevated corridor. Recent reporting also highlighted the need for continued maintenance of the elevated structure, including drainage and waterlogging-related issues.
The Electronic City Elevated Expressway was built to provide a faster high-capacity route between Central Silk Board and Electronic City, where ground-level Hosur Road traffic was heavily affected by signals and junction congestion. By carrying through traffic on an elevated structure, the project was designed to improve travel speeds and reduce delays along the Bengaluru–Hosur corridor.
Yes. 'Electronic City Expressway', 'Electronic City Elevated Expressway' and 'Electronics City Elevated Expressway' are commonly used names for the elevated highway connecting the Central Silk Board area with Electronic City. The official NHAI toll records refer to the facility as the elevated section between Silk Board Junction and Electronic City.
Related Infrastructure Projects
Bengaluru NICE Road
An operational access-controlled peripheral tollway developed by NICE connecting multiple major highway corridors around South and West Bengaluru.
View Project →Bengaluru NICE Link Road
An operational tollway corridor developed by NICE linking the Banashankari / Outer Ring Road area to the Sompura cloverleaf interchange area on the NICE Peripheral Road.
View Project →Bengaluru Peripheral Ring Road
A proposed 73.03 km 8-lane greenfield access-controlled bypass (Bangalore Business Corridor) planned by BDA on a 65 m corridor width under DBOT/PPP mode at an estimated cost of approximately ₹27,000 Crore with a 2029 target completion.
View Project →Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.
