Advertisement // Sponsor

Verified Partner
Loading sponsor...
CORRIDOR DOSSIER INDEX // ELECTRONIC-CITY-BENGALURU

Electronic City Elevated Expressway (Bengaluru) Route Map, Toll Rates & Exit Guide (2026)

Last Updated: 10 November 2026
StatusFully Operational
Length9.98 km
Corridor StatusAll 1 Packages Open (100%)
CompletionOpened on 22 January 2010
Last Updated10 November 2026
The Electronic City Elevated Expressway (Bengaluru Elevated Tollway) is an operational 9.98 km elevated highway corridor in South Bengaluru, linking Silk Board Junction to Electronic City along NH-44. Access the latest FASTag rules, travel time impact, toll calculator, live traffic status, entry points, and exit ramps.

The Electronic City Elevated Expressway (also known as the Hosur Road Elevated Expressway) is a fully operational, premium 9.98 km access-controlled elevated corridor developed by Bengaluru Elevated Tollway Private Limited (BETL).

The Electronic City Elevated Expressway Route connects South Bangalore to the key IT cluster. Commuting from Silk Board to Electronic City Elevated Expressway takes only 10 minutes compared to 45 minutes at grade. To bypass regular congestion, Electronic City Elevated Expressway Traffic conditions are monitored live at major entry/exit ramps.

Project Summary

The Electronic City Elevated Expressway is a fully operational 9.98 km elevated tollway corridor connecting Central Silk Board to Electronic City in Bengaluru. Developed by Bengaluru Elevated Tollway Pvt Ltd (BETL) under NHAI, it bypasses congested stretches of Hosur Road (NH-44).

ಎಲೆಕ್ಟ್ರಾನಿಕ್ ಸಿಟಿ ಎಲಿವೇಟೆಡ್ ಎಕ್ಸ್‌ಪ್ರೆಸ್‌ವೇ (Electronic City Elevated Expressway)

ಬೆಂಗಳೂರಿನ ಸಿಲ್ಕ್ ಬೋರ್ಡ್ ಜಂಕ್ಷನ್‌ನಿಂದ ಎಲೆಕ್ಟ್ರಾನಿಕ್ ಸಿಟಿಯವರೆಗೆ 9.98 ಕಿಮೀ ಉದ್ದದ ಎಲಿವೇಟೆಡ್ ಟೋಲ್‌ವೇ ಕಾರಿಡಾರ್ ಆಗಿದೆ.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Total Length9.98 km
Estimated CostApproximately ₹775 Crore
Implementing AgencyNational Highways Authority of India (NHAI) · Formerly BETPL
Current StatusFully Operational
CompletionOpened on 22 January 2010
Route Map

Electronic City Elevated Expressway Route Map & Alignment

Track the Electronic City Elevated Expressway (Bengaluru Elevated Tollway) route map, latest toll rates, live traffic status, FASTag info, and entry/exit ramps.

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Electronic City Elevated Expressway Route Map and Alignment
Loading Interactive GIS Map...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Project NameElectronic City Elevated Expressway
Total Length9.98 km
Estimated CostApproximately ₹775 Crore
Current StatusFully Operational
Corridor Status: The 9.98 km Electronic City Elevated Expressway (Hosur Road Flyover) has been fully operational since 22 January 2010, connecting Central Silk Board to Electronic City.
Project Parameters & Technical Details

Electronic City Elevated ExpresswayCost • Route • Timeline

ParameterTechnical Details
Project NameElectronic City Elevated Expressway (Bengaluru Elevated Tollway)
Total Length9.98 km
Current StatusFully Operational
Estimated CostApproximately ₹775 Crore
Development ModelBOT Concession by BETPL (expired 10 September 2026); currently operated by NHAI
Target CompletionOpened on 22 January 2010
Corridor End PointElectronic City Phase I & II (Hosur Road / NH-44)
Lane Configuration4-Lane Elevated Viaduct + 6-Lane At-Grade Highway (NH-44)
Corridor Start PointCentral Silk Board Junction (South Bengaluru)
Official Project NameElectronic City Elevated Expressway (Bengaluru Elevated Tollway / BETL)
Total Corridor Length9.98 km (4-Lane Elevated Expressway over 6-Lane NH-44)
Current Project StatusFully Operational
Implementing AuthorityNational Highways Authority of India (NHAI) · Formerly BETPL
Inauguration / Opening Date22 January 2010
Elevated Corridor (Plaza Code: 35001) · Published July 2026 Tariff · Post-Concession NHAI Management

Electronic City Elevated Expressway (NH-44) Toll Rates & Concession Status (2026)

The Electronic City Elevated Expressway is an operational 9.98 km elevated 4-lane highway on NH-44 (formerly NH-7) running from Central Silk Board Junction to Electronic City in South Bengaluru. Toll collection is managed via the dedicated elevated section toll plaza at Km 18.000.

ℹ️ Verified Tolling System & Facility Audit

Important Distinction & Post-Concession Status Update (September–November 2026): The elevated corridor operates with one single toll plaza (Elevated Section / Electronic City Toll Plaza, Plaza Code: 35001 at Km 18.000). Attibele Toll Plaza is a separate toll point further south on the Bengaluru–Hosur NH-44 corridor near the Karnataka–Tamil Nadu border and is not a plaza on the elevated flyover. Concession Concluded: The 15-year Build-Operate-Transfer (BOT) concession agreement of Bangalore Elevated Tollway Pvt. Ltd. (BETPL) officially ended on 10 September 2026, and NHAI took over the corridor. NHAI's Bengaluru regional office stated that toll collection continues under the existing statutory Gazette notification until required statutory procedures, including a potential new Gazette notification, are completed. Two-wheeler exemption has been actively discussed but remains pending an official notification.

Toll Plaza Identification (NH-44 Elevated Section)
1 Toll Point
No.Toll Plaza NamePlaza Code / ChainageInterchange Details & Connectivity
1Elevated Section / Electronic City Toll Plaza35001Highway: NH-44 (formerly NH-7) at Km 18.000. Tollable Length: ~9.994 km (Silk Board Junction to Electronic City). Concessionaire before expiry: BETPL. Current Authority: NHAI (taken over 10 September 2026).
Interactive Toll Tariff

Calculate Exact Toll Rates & Journey Price

Check single-trip, return journey discounts, monthly pass tariffs, and per-km pricing for Car, LCV, Bus, Truck, and Multi-Axle vehicles across all verified plazas on the Toll Calculator.

Calculate Toll Price→

Published baseline tariff effective 1 July 2026. Operator BETPL's concession period ended on 10 September 2026. Corridor and plaza operations transitioned to NHAI. Toll collection continues under existing statutory notification pending official post-concession Gazette notification. Sources: Indian Express, Moneycontrol, NHAI circulars, NPCI Plaza Master (Code: 35001).

Junctions & Ramps Covered

Key Junctions & Ramps Along Electronic City Elevated Expressway

The 9.98 km elevated viaduct spans major commercial and residential intersections along Hosur Road (NH-44).

Central Silk Board Junction
Northern Origin (0.0 km)

Primary entry/exit ramp connecting Outer Ring Road (ORR) and Madiwala to the elevated flyover.

Bommanahalli, Garvebhavipalya, Kudlu Gate & Singasandra
Elevated Mid-Section

High-pier viaduct bypassing dense urban signals at Bommanahalli, Kudlu Gate, Singasandra, and Hosa Road.

Electronic City Phase I & II (NICE Road Interchange)
Southern Terminal (9.98 km)

Dedicated exit loops into Electronic City IT campus, BETL Toll Plaza, and NICE Peripheral Ring Road.

Corridor Alignment

Electronic City Elevated Expressway Route & Ramps Overview

The Electronic City Elevated Expressway (officially the Bengaluru Elevated Tollway, operated by BETL under NHAI) is a 9.98 km four-lane access-controlled elevated highway built directly above the six-lane Hosur Road (NH-44) in South Bengaluru. Running from Central Silk Board Junction to Electronic City, it is one of India's longest urban elevated highway flyovers, serving Bengaluru's largest IT and electronics hub.

Travel Time Impact

Silk Board to Electronic City Travel Time Reduction

The elevated expressway reduces commute time between Central Silk Board Junction and Electronic City from 45–60 minutes on the signalized at-grade Hosur Road to just 10–12 minutes.

Operations & Connectivity

Electronic City Flyover Toll, FASTag & NICE Road Connectivity

Constructed above NH-44 under a Build-Operate-Transfer (BOT) concession, the Electronic City Elevated Expressway integrates directly with the NICE Peripheral Road interchange at Electronic City and is fully equipped with automated FASTag tolling lanes for cars, two-wheelers, buses, and commercial vehicles.

  • 9.98 km 4-lane elevated viaduct bypassing 10+ major traffic signals on Hosur Road (NH-44)
  • Direct ramp integration with Electronic City Phase I, Phase II, and NICE Road
  • FASTag-enabled BETL toll plaza at the Electronic City end
  • Complements Namma Metro Yellow Line (RV Road – Bommasandra) along the Hosur Road IT corridor

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Timeline

Latest Developments

Reported developments from news sources and official announcements
Video Coverage

Video Updates

Latest drone footage, progress reports, and ground coverage

Advertisement // Sponsor

Verified Partner
Loading sponsor...
General Inquiries

Frequently Asked Questions

The Electronic City Elevated Expressway is a nearly 10 km elevated highway on NH-44 (formerly NH-7) in Bengaluru. It connects Central Silk Board Junction with Electronic City along the Hosur Road corridor and provides an elevated alternative to the signal-heavy road below.

Related Infrastructure Projects

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Karnataka Dashboard →KA
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement