Advertisement // Sponsor
Verified PartnerBengaluru–Vijayawada Expressway Route Map, Status & Latest Updates (2026)
Track packages, GIS alignment, and construction status for the 518 km Bengaluru–Vijayawada economic corridor, featuring a 343 km greenfield access-controlled expressway section (NH-544G).
The Bengaluru–Vijayawada expressway project has made significant strides in recent months, with India’s National Highways Authority of India (NHAI) setting four Guinness World Records for the expressway. Dilip Buildcon has secured completion certificates for three expressway packages. The project is expected to be completed by 2026, and it promises to cut travel time from Bangalore to Vijayawada by up to four hours via National Highway-44. Additionally, national highway bids are ongoing, with thirteen companies having expressed interest in the construction work.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Bengaluru–Vijayawada Expressway Route Map & Alignment
Explore the interactive GIS alignment and 14 package boundaries of the 518 km Bengaluru–Vijayawada Expressway (NH-544G), including the 343 km greenfield section between Kodikonda and Addanki.
Advertisement // Sponsor
Verified Partner
Advertisement // Sponsor
Verified PartnerBengaluru–Vijayawada ExpresswayCost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| Lanes | 4 lanes (expandable to 6/8 lanes) |
| End Point | Addanki, Bapatla district, Andhra Pradesh (connects to Vijayawada via NH-16) |
| Start Point | Kodikonda, Anantapur district, Andhra Pradesh (Greenfield origin; connects to Bengaluru via NH-44) |
| Project Name | Bengaluru–Vijayawada Expressway (NH-544G) |
| Total Length | 518.0 km |
| Current Status | Under Construction / Execution |
| Estimated Cost | ₹14,000 Crores (Revised) / ~₹19,200–₹19,320 Crores (Full Corridor) |
| Corridor Length | 518 km (343 km Greenfield Expressway section + Brownfield NH-44 / NH-16 sections) |
| Districts Covered | 10 districts across Karnataka & Andhra Pradesh |
| Target Completion | 2027 |
| Major Interchanges | Kodikonda, Pulivendula, Mallepalli, Addanki |
| Expected Completion | Staggered through 2026–2027 |
| Implementing Agency | National Highways Authority of India (NHAI) |
| Implementing Authority | NHAI |
Bengaluru–Vijayawada Expressway Districts & Route Coverage
The expressway passes through 10 districts across Karnataka and Andhra Pradesh, unlocking industrial and agricultural logistics across Rayalaseema and Coastal Andhra.
Southern origin near Kempegowda International Airport.
Connects Bagepalli / Karnataka border corridor.
Greenfield start at Kodikonda checkpost via Puttaparthi/Kadiri region.
Traverses Pulivendula and Kadapa mineral/horticulture belt; includes Guinness World Record bituminous paving stretch.
Central greenfield transition through Nallamala foothills.
Major eastern greenfield alignment toward coastal plain.
Greenfield northern terminus merging with NH-16 (Chennai–Kolkata Highway).
Connects Chilakaluripet, Guntur, Amaravati capital region, and Vijayawada.
Total monitored construction packages: 14 packages under NHAI.
Bengaluru–Vijayawada Expressway Route & Alignment (NH-544G)
The 518 km corridor uses a hybrid model combining existing upgraded four-lane highways with a 343 km greenfield section: • Brownfield Start (Bengaluru to Kodikonda): ~90 km along existing NH-44 from Devanahalli (Bengaluru) to Kodikonda checkpost on the Karnataka–Andhra Pradesh border. • Greenfield Core (Kodikonda to Addanki): ~343 km of new access-controlled expressway traversing Sri Sathya Sai, Kadapa (YSR), Nandyal, Prakasam, and Bapatla districts. • Brownfield End (Addanki to Vijayawada): ~85–115 km along existing NH-16 connecting Addanki, Chilakaluripet, Guntur, and Vijayawada.
Bengaluru to Vijayawada Travel Time & Distance Reduction
The Bengaluru–Vijayawada Expressway reduces travel distance from ~620–650 km to ~518 km and cuts travel time between Bengaluru and Vijayawada/Amaravati from 11–12 hours down to 6 hours.
Bengaluru–Vijayawada Expressway Overview
The Bengaluru–Vijayawada Expressway (NH-544G) is an under-construction 4-to-6 lane access-controlled highway connecting Karnataka's capital Bengaluru with Andhra Pradesh's commercial hub Vijayawada and capital region Amaravati. Developed by NHAI under Bharatmala Pariyojana Phase-I across 14 packages, it features a 343 km greenfield section between Kodikonda and Addanki.
Recent Developments & Guinness World Record Achievement
In January 2026, NHAI and contractor Rajpath Infracon Pvt. Ltd. achieved four Guinness World Records on Packages 2 and 3 near Puttaparthi/Kadapa by laying 28.95 lane-km of continuous bituminous concrete (10,675 metric tonnes) within 24 hours. Earthwork, culverts, and major bridges across the 14 packages are advancing toward phased commissioning in 2026–2027.
- 2021: Expressway plan announced by AP Government and approved under Bharatmala Pariyojana.
- September 2022: Designated as National Highway 544G (NH-544G) by NHAI.
- January–February 2023: Civil packages awarded to Dilip Buildcon, Raj Path Infracon, MEIL, and other contractors.
- March 2024: Foundation stone laid by PM Narendra Modi.
- January 2026: Four Guinness World Records set for 24-hour continuous bituminous paving.
- 2026–2027: Target staggered completion across all 14 packages.
Advertisement // Sponsor
Verified PartnerLatest Developments
Video Updates
Advertisement // Sponsor
Verified PartnerFrequently Asked Questions
The Bengaluru–Vijayawada Expressway is officially developed as the Bengaluru–Kadapa–Vijayawada Economic Corridor (NH-544G), a six-lane, access-controlled greenfield highway being implemented by NHAI under Bharatmala Pariyojana. The new greenfield corridor runs from Kodikonda on NH-44 through Kadapa towards Muppavaram near Addanki, where it connects with existing NH-16 towards Vijayawada. The greenfield Kodikonda–Muppavaram section is about 343 km.
The Bengaluru–Vijayawada route uses existing NH-44 from the Bengaluru side up to Kodikonda in Andhra Pradesh, followed by the new NH-544G greenfield corridor through the Rayalaseema region towards Muppavaram near Addanki. From Muppavaram, the corridor uses existing NH-16 to reach Vijayawada. The greenfield section passes through the Kadapa region and provides connectivity toward major industrial locations including Hindupur and Kopparthi.
The project alignment begins at Kodikonda on NH-44 and proceeds eastward through the NH-544G greenfield corridor to Muppavaram near Addanki on NH-16. NHAI package documents divide the Andhra Pradesh greenfield alignment into numbered packages, with chainages running from 0+000 at the Kodur/Kodikonda side through the corridor toward Muppavaram. The official NHAI package documents provide more reliable alignment information than third-party Google Maps representations.
The current official NHAI description identifies the Bengaluru–Kadapa–Vijayawada Economic Corridor as a 343 km long access-controlled six-lane corridor. The 343 km figure refers to the new greenfield Bengaluru–Kadapa–Vijayawada corridor highlighted by NHAI in January 2026. Earlier project descriptions specify 342.5 km from Kodikonda to Muppavaram.
The project does not have one single package cost because the greenfield corridor is divided into multiple NHAI packages. The Ministry's 2024 year-end review states that 14 packages of the Bengaluru–Kadapa–Vijayawada Expressway in Andhra Pradesh were valued at about ₹14,000 crore. Individual package costs vary; for example, the 32 km Chandrasekharapuram–Polavaram package was approved at ₹1,292.65 crore.
Yes. The NH-544G greenfield corridor is under implementation, with multiple packages awarded and construction underway. NHAI's implementation records list packages such as Kodur–Vanavolu, Vanavolu–Vankarakunta, Vankarakunta–Odulapalle, Odulapalle–Nallacheruvu Palli, Nallacheruvu Palli–Yerragudipadu, Yerragudipadu–Audireddipalle and Narayanmpet–Chandrasekharapuram as under construction.
As of September 2026, the Bengaluru–Kadapa–Vijayawada Economic Corridor is actively under construction across its packages rather than being fully operational. Construction has reached major milestones: NHAI achieved four Guinness World Records for bituminous-concrete laying on Packages 2 and 3 in January 2026, and a 3.68 km tunnel under Package 9 achieved excavation breakthrough in September 2026.
The latest major update is the September 4, 2026 breakthrough of the 3.68 km tunnel under Package 9 between Porumamilla in YSR Kadapa district and Sitaramapuram in SPSR Nellore district. The tunnel package has an estimated cost of ₹1,092.18 crore and is expected to be completed by mid-2027. NHAI says the tunnel will shorten the route through the hilly and forested section by about 17 km.
There is no single reliable official full-corridor completion date that should be published as the definitive opening date. Different NH-544G packages have individual construction schedules, and the September 2026 NHAI update specifically states that Package 9's tunnel is likely to be completed by mid-2027. Therefore, the overall Bengaluru–Vijayawada corridor should currently be described as under construction with package-wise completion rather than assigned one unverified opening date.
NHAI says the completed Bengaluru–Kadapa–Vijayawada Economic Corridor will reduce the Bengaluru–Vijayawada travel distance by about 100–110 km and save roughly 3–4 hours compared with the existing route. The January 2026 NHAI release describes the current distance as about 635 km and the future corridor distance as around 535 km.
Related Infrastructure Projects
Hyderabad–Bengaluru High-Speed Rail
A ~618 km high-speed rail corridor at 320 km/h connecting India's two premier technology and innovation hubs.
View Project →Surat Chennai Expressway
A massive greenfield and brownfield economic corridor linking Surat in Gujarat to Chennai in Tamil Nadu, passing through Maharashtra, Karnataka, Telangana, and Andhra Pradesh.
View Project →Pune Bengaluru Expressway
A proposed ~700 km greenfield corridor linking Pune and Bengaluru to slash travel times.
View Project →Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.
