Advertisement // Sponsor
Verified PartnerNagpur Metro Orange Line (Line 1): Route Map, Stations & Operational Details
Nagpur Metro Line 1 (Orange Line) is a 19.658 km operational North-South metro corridor connecting Automotive Square to Khapri across 18 stations. Implemented by Maharashtra Metro Rail Corporation Limited (Maha-Metro), the line features elevated and at-grade sections (Airport South, New Airport, Khapri) and India's longest 3.14 km double-decker viaduct on Wardha Road certified by Guinness World Records, Asia Book of Records, and India Book of Records.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Nagpur Metro Line 1 (Orange Line) Economics
Nagpur Metro Line 1 (Orange Line) Stations
| # | Station | Type | Interchange / Connection | Opened |
|---|---|---|---|---|
| 01 | Automotive Square | Elevated | NH-44 Highway Access | 11 December 2022 |
| 02 | Nari Road | Elevated | Local Transit | 11 December 2022 |
| 03 | Indora Square | Elevated | North Nagpur Corridor | 11 December 2022 |
| 04 | Kadbi Square | Elevated | Commercial Hub | 11 December 2022 |
| 05 | Gaddi Godam Square | Elevated | Central Railway ROB Crossing | 11 December 2022 |
| 06 | Kasturchand Park | Elevated | Heritage & Sports Complex | 21 August 2021 |
| 07 | Zero Mile Freedom Park | Elevated | Historical Center of India | 21 August 2021 |
| 08 | Sitabuldi Interchange | Interchange | Aqua Line (Line 2) Transfer Hub | 08 March 2019 |
| 09 | Congress Nagar | Elevated | Ajni Railway Station Connection | 6 April 2021 |
| 10 | Rahate Colony | Elevated | Medical Square Link | 22 October 2020 |
| 11 | Ajni Square | Elevated | Wardha Road Hub | 22 October 2020 |
| 12 | Chhatrapati Square | Elevated | Wardha Road Double-Decker Viaduct | 6 April 2021 |
| 13 | Jaiprakash Nagar | Elevated | Wardha Road Double-Decker Viaduct | 20 November 2019 |
| 14 | Ujwal Nagar | Elevated | Wardha Road Double-Decker Viaduct | 6 April 2021 |
| 15 | Airport | Elevated | Nagpur International Airport Access | 08 March 2019 |
| 16 | Airport South | At-Grade | Cargo Complex Access | 08 March 2019 |
| 17 | New Airport | At-Grade | MIHAN SEZ Gateway | 08 March 2019 |
| 18 | Khapri | At-Grade / Terminal | MIHAN Depot Terminal | 08 March 2019 |
Nagpur Metro Line 1 (Orange Line) Route Map
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerNagpur Metro Line 1 (Orange Line) Technical Specifications
| Parameter | Value |
|---|---|
| Estimated Cost | Part of Phase 1 Revised ₹9,279.06 Cr |
| Corridor Type | Rapid Transit Metro (Elevated & At-Grade) |
| Primary Depot | MIHAN Maintenance Depot |
| Track Gauge | Standard Gauge (1435 mm) |
| Total Length | 19.658 km |
| Opened / Est. Opening | March 2019 (Khapri to Sitabuldi) / Dec 2022 (Automotive Square to Sitabuldi) |
| Corridor Status | Fully Operational |
| Operator | Maharashtra Metro Rail Corporation Limited (Maha-Metro) |
| Stations Count | 18 Operational Stations |
| Line Number | Line 1 (Orange Line) |
| Rolling Stock | CRRC 3-car stainless steel Metro trainsets |
| targetOpening | Fully Operational |
| Electrification System | 25kV AC Overhead Catenary (OHE) |
| Government Monitoring Target | December 2022 |
Nagpur Metro Line 1 (Orange Line) Timeline
Government of India approved Nagpur Metro Phase 1 project
Prime Minister Narendra Modi inaugurated 13.5 km priority section (Khapri to Sitabuldi)
Northern section from Sitabuldi to Automotive Square completed, bringing the entire 19.658 km Orange Line into full operation.
Nagpur Metro Line 1 (Orange Line) Economic & Connectivity Impact
Economic Significance
Cuts travel time between Automotive Square (North Nagpur) and Khapri / MIHAN SEZ (South Nagpur) from 60+ minutes by road to under 28 minutes.
Traffic Impact
Diverts heavy commuter traffic from Wardha Road (NH-44) and Kamptee Road, eliminating bottleneck congestion at Chhatrapati Square and Sitabuldi.
Employment Centres Served
Acts as the direct rapid transit spine for thousands of IT professionals, engineers, and cargo workers commuting daily to MIHAN SEZ and Airport.
Intermodal Connectivity
Seamless interchange with Aqua Line (Line 2) at Sitabuldi, Central Railway at Ajni Station, and Airport connectivity via Airport and Airport South stations.
Impact on Real Estate
Accelerated residential and commercial real estate development along Wardha Road, South Nagpur, and MIHAN telecom/IT corridor.
Nagpur Metro Line 1 (Orange Line) Alignment Map & GIS Explorer
Advertisement // Sponsor
Verified PartnerAdvertisement // Sponsor
Verified PartnerFrequently Asked Questions
Advertisement // Sponsor
Verified PartnerEnjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.
