Advertisement // Sponsor

Verified Partner
Loading sponsor...
METRO CORRIDOR DOSSIER // AGRA-METRO-LINE-1

Agra Metro Line 1 (Yellow Line) Route Map, Stations & Status

Fully Operational📏 6.0 km🚉 6 Operational Stations Stations🗓 6 March 2024 — Taj East Gate–Mankameshwar Mandir priority section🏢 Uttar Pradesh Metro Rail Corporation Limited (UPMRC)

Agra Metro Line 1 (Yellow Line) is a 13.7 km corridor connecting Taj East Gate to Sikandra with 13 stations (6 elevated and 7 underground). Implemented by Uttar Pradesh Metro Rail Corporation Limited (UPMRC), the 6 km Taj East Gate–Mankameshwar Mandir priority section has been operational since 6 March 2024; the remaining underground and elevated section toward Sikandra is under active construction.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Agra Metro Line 1 (Yellow Line) Economics

Agra Metro Line 1 (Yellow Line) Economics

Project Cost₹8,379.62 crore (Approved Phase 1 Cost)
Primary Backers50:50 Joint Venture of Government of India and Government of Uttar Pradesh (Equity) + European Investment Bank (EIB) Loan Financing
Operator / ModelEPC Construction Contracts
Station list

Agra Metro Line 1 (Yellow Line) Stations

#StationTypeInterchange / ConnectionOpened
01
Taj East Gate
ElevatedTourist Area Access6 March 2024
02
Shaheed Captain Shubham Gupta
ElevatedFatehabad Road6 March 2024
03
Fatehabad Road
Elevated—6 March 2024
04
Taj Mahal
UndergroundTourist Access6 March 2024
05
Agra Fort
UndergroundAgra Fort Railway Station6 March 2024
06
Mankameshwar Mandir
UndergroundJama Masjid Area6 March 2024
Geospatial Alignment

Agra Metro Line 1 (Yellow Line) Route Map

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Loading GIS Map Environment...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Specs sheet

Agra Metro Line 1 (Yellow Line) Technical Specifications

ParameterValue
Estimated Cost₹4,200 crore
Corridor TypeElevated & Underground
Primary DepotPAC Depot (Fatehabad Road)
Track GaugeStandard Gauge (1435 mm)
Total Length6.0 km
Opened / Est. Opening6 March 2024 — Taj East Gate–Mankameshwar Mandir priority section
Corridor StatusFully Operational
OperatorUttar Pradesh Metro Rail Corporation Limited (UPMRC)
Stations Count6 Operational Stations
Line NumberLine 1 (Yellow Line)
Rolling StockAlstom Movia Metro trainsets
targetOpening6 March 2024
Electrification System750V DC Third Rail
Government Monitoring Target6 March 2024
Chronological Milestones

Agra Metro Line 1 (Yellow Line) Timeline

2019

Union Cabinet approved Agra Metro Phase 1 (29.4 km, 27 stations, ₹8,379.62 crore)

December 2020

Construction work commenced for Agra Metro Phase 1

6 March 2024

Taj East Gate–Mankameshwar Mandir 6 km priority section inaugurated and passenger services commenced

Geospatial Explorer

Agra Metro Line 1 (Yellow Line) Alignment Map & GIS Explorer

Elevated / Underground6 Operational Stations (3 Elevated, 3 Underground)
Primary DepotPAC Depot (Fatehabad Road)

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Advertisement // Sponsor

Verified Partner
Loading sponsor...
Answers

Frequently Asked Questions

Agra Metro Yellow Line, also known as Line 1, runs between Taj East Gate and Sikandra. The full Corridor 1 is about 13.7 km long and includes 13 stations, with the remaining section toward Sikandra under construction.

Advertisement // Sponsor

Verified Partner
Loading sponsor...

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Uttar Pradesh Dashboard →UP
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Android App Live

Indian Infraproject In Your Pocket — Full route alignments on the go, live GPS positioning & instant alerts.

Get on Google Play
Sponsored // Advertisement